Storage power plant · Cumberland, NC
Butler
Butler is a 10 MW storage power plant in Cumberland County, North Carolina, operated by North Carolina El Member Corp. Its oldest generator still running came online in 2024.
Butler in context
Among the 39 storage plants in North Carolina in the EIA's inventory, it is the 12th largest, about 1.8% of the state's 562 MW of storage capacity.
Cumberland County has 18 power plants of 1 MW or more with 455 MW in all; Butler is 2% of that and the largest of 2 storage plants there.
The average electricity customer in Cumberland County goes 4.2 hours a year without power, the 84th most of 100 counties in North Carolina. The county's page has the full outage record.
Where it is
Butler (outlined) and other plants in Cumberland County, shaded. 34.898, -78.899.
Plant facts
- Operator
- North Carolina El Member Corp
- Sector
- Electric Utility
- Grid operator
- CPLE
- County
- Cumberland County, NC
- EIA plant ID
- 67042
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BAT1 | Batteries | 10 MW · 20 MWh | 2024 | – |
Nearby
Other plants in Cumberland County
Questions
Butler, answered
How much can Butler store and deliver?
Butler can deliver up to 10 MW and hold 20 MWh of energy, from one battery or storage system. Its net energy in 2025 was -0.5 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Butler?
Butler is in Cumberland County, North Carolina, at about 34.898°, -78.899°. It is one of 18 power plants of 1 MW or more in the county. The average electricity customer in Cumberland County goes 4.2 hours a year without power, the 84th most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates Butler?
It is operated by North Carolina El Member Corp (EIA sector: Electric Utility), and it feeds balancing authority CPLE.
When did Butler open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.