Data centers · Wisconsin

Data centers in Wisconsin

18 operating data center sites, 11 projects planned or under construction and 2 AI campuses planned to draw 4.0 GW.

Operating sites180 whole campuses
AI campuses2369 MW drawn now
In the pipeline113 under construction, 8 planned
Home price18.1¢/kWh+29% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Wisconsin's AI data centers

CampusOwnerWhereNowPlanned
Microsoft Fairwater WisconsinMicrosoftRacine County369 MW2.7 GW
OpenAI Stargate WisconsinOracleOzaukee County–1.3 GW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Vantage Port Washington Campus (Lighthouse) Vantage Data Centers Ozaukee Under construction 902 MW –
WI Meta Data Center Meta Dodge Under construction 220 MW 2027
Meta Beaver Dam Data Center Meta Dodge Under construction – –
Cloverleaf Wrightstown Data Center Prospect Cloverleaf Infrastructure Brown Planned 1.0 GW –
Viridian APECS Data Center Campus - Janesville Viridian Partners Rock Planned 800 MW –
Balloonist Red Cedar / Menomonie Data Center Balloonist LLC Dunn Planned 450 MW –
Beaver Dam Data Center Meta Dodge Planned 220 MW 2027
Degas Beaver Dam Data Center Degas LLC Dodge Planned 220 MW –
Kenosha Campus Microsoft Kenosha Planned – –
Meta Project Cornmaze Data Center - Beloit Panattoni Development Company Rock Planned – –
PCH / PNK Wisconsin Rapids Data Center PCH WI Holdings LLC Wood Planned – 2030
QTS Wisconsin QTS Dane Cancelled 1.6 GW –
Cassville Data Center Prospect Undisclosed Grant Cancelled 450 MW –
Cloverleaf Carlton / Kewaunee County Data Center Prospect Cloverleaf Infrastructure Kewaunee Cancelled 100 MW –
DPO WI Digital Power Optimization Wood Cancelled 20 MW –
Caledonia Campus (Oak Creek) Microsoft Racine Cancelled – –

Local pushback

Bans and moratoriums

33 recorded as enacted, 3 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Menasha · Winnebago Local Enacted Oct 5, 2026 A stated duration, but the end date isn't recorded here
Janesville · Rock Local Enacted Sep 28, 2026 to Sep 28, 2027
Sauk County · Sauk County Enacted Sep 15, 2026 A stated duration, but the end date isn't recorded here
St. Croix County · St. Croix Local Enacted Sep 1, 2026 to Sep 1, 2027
Sawyer County · Sawyer County Enacted Aug 20, 2026 A stated duration, but the end date isn't recorded here
Oneida County · Oneida County Enacted Aug 19, 2026 to Aug 19, 2027
La Crosse · La Crosse Local Enacted Aug 14, 2026 to Feb 14, 2028
Bellevue · Brown Local Enacted Aug 12, 2026 to Aug 12, 2027
Chippewa County · Chippewa Local Enacted Aug 11, 2026 A stated duration, but the end date isn't recorded here
Dodge County · Dodge Local Enacted Aug 10, 2026 to Feb 10, 2028
Milwaukee · Milwaukee Local Proposed Aug 10, 2026 Runs until a condition is met, not to a date
La Crosse County · La Crosse Local Enacted Jun 18, 2026 to Dec 18, 2027
Superior · Douglas Local Enacted Jun 17, 2026 to Jun 17, 2027
Village of Wrightstown · Brown Local Enacted Jun 16, 2026 to Jun 16, 2027
Dane County · Dane Local Enacted Jun 4, 2026 to Dec 4, 2027

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Milwaukee County53.1 h
Dane County51.2 h
Racine County33.1 h
Calumet County13.1 h
Waukesha County16.9 h
Marquette County15.9 h
Dunn County11.8 h
Columbia County11.4 h

Every named site

The list

11 of 18 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Microsoft Fairwater 1 (Mount Pleasant) Microsoft Racine Civic Returns 207
Pewaukee Data Center – Waukesha Building 1.1
Marquette-Adams Telephone Coop – Marquette Building 0.2
EdgeConneX MAD01 EdgeConneX Dane Civic Returns 0.2
Data Holdings Data Center – Milwaukee Point –
TierPoint Milwaukee – Milwaukee Point –
Lumen Madison 1 Data Center Lumen Dane Point –
Cogent Milwaukee 2 Data Center Cogent Communications Milwaukee Operator's own list –
US Signal WI02 Madison US Signal Dane Operator's own list –
US Signal WI01 Madison US Signal Dane Operator's own list –
Ameritech Howell Data Center – Milwaukee EPA record –

How many data centers are in Wisconsin?

18 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 34th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Wisconsin?

3 under construction and 8 planned or announced in the Civic Returns and Server Country databases; the 7 that publish a size add up to about 3.8 GW, besides 2 AI campuses tracked by Epoch AI. 5 projects have been cancelled.

Which Wisconsin county has the most data centers?

Milwaukee County, with 5 operating sites, then Dane County (5) and Racine County (3).

Who operates data centers in Wisconsin?

Among sites that name an operator: US Signal (2), Microsoft (1), EdgeConneX (1), Lumen (1), Cogent Communications (1).

What AI data centers are in Wisconsin?

Microsoft Fairwater Wisconsin in Mount Pleasant (369 MW now, 2.7 GW planned); OpenAI Stargate Wisconsin in Port Washington (not yet drawing power, 1.3 GW planned), by Epoch AI's estimates.

What do Wisconsin households pay for electricity?

18.1¢ per kWh on average in 2025 (US: 17.2¢), up 29% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.