Data centers · New Hampshire
Data centers in New Hampshire
7 operating data center sites, 1 projects planned or under construction.
The map
Every mapped site
The pipeline
Projects on the way
From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.
| Project | Developer | County | Status | Announced size | Year |
|---|---|---|---|---|---|
| FirstLight Bedford Data Center (formerly ColoSpace) | FirstLight | Hillsborough | Planned | – | – |
| Nottingham Business Park Data Center | Nottingham Business Park LLC | Rockingham | Cancelled | – | – |
Local pushback
Bans and moratoriums
3 recorded as enacted, 4 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.
| Where | Level | Status | Date | Runs |
|---|---|---|---|---|
| New Hampshire (Senate) · Merrimack | State | Proposed | Sep 18, 2026 | Term not documented |
| Nottingham · Rockingham | Local | Enacted | Sep 8, 2026 | A stated duration, but the end date isn't recorded here |
| Bow · Merrimack | Town | Under Review | Sep 1, 2026 | Term not documented |
| Rochester · Strafford | Local | Enacted | Sep 1, 2026 | No end date by design — a permanent ban or standing statute |
| New Hampshire (Ayotte) · Merrimack | State | Proposed | Aug 20, 2026 | Term not documented |
| Keene · Cheshire | Local | Under Review | Jun 18, 2026 | Term not documented |
| New Hampshire (HB 1265) · Merrimack | State | Defeated | Mar 11, 2026 | Term not documented |
| Canterbury · Merrimack | Local | Enacted | Mar 10, 2026 | No end date by design — a permanent ban or standing statute |
By county
Where the data centers cluster
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Rockingham County | 3 | 6.2 h |
| Hillsborough County | 2 | 4.6 h |
| Strafford County | 1 | 5.1 h |
| Grafton County | 1 | 8.0 h |
Every named site
The list
7 of 7 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).
| Site | Operator | County | Source | Acres |
|---|---|---|---|---|
| – | University of New Hampshire | Strafford | Building | 0.7 |
| – | FirstLight | Rockingham | Building | 0.2 |
| Information Technology Data Center | – | Rockingham | Building | 0.2 |
| FirstLight Manchester | FirstLight | Hillsborough | Operator's own list | – |
| Health Dialog Bedford Datacenter | – | Hillsborough | EPA record | – |
| Liberty Mutual Data Center | – | Rockingham | EPA record | – |
| Dartmouth College Data Center | – | Grafton | EPA record | – |
How many data centers are in New Hampshire?
7 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 42nd most of any state. The map covers most large sites, not every server room, so the true number is higher.
How many data centers are being built in New Hampshire?
0 under construction and 1 planned or announced in the Civic Returns and Server Country databases. 1 project has been cancelled.
Which New Hampshire county has the most data centers?
Rockingham County, with 3 operating sites, then Hillsborough County (2) and Strafford County (1).
Who operates data centers in New Hampshire?
Among sites that name an operator: FirstLight (2), University of New Hampshire (1).
What do New Hampshire households pay for electricity?
24.5¢ per kWh on average in 2025 (US: 17.2¢), up 25% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.
Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.