Data centers · New Hampshire

Data centers in New Hampshire

7 operating data center sites, 1 projects planned or under construction.

Operating sites70 whole campuses
AI campuses0None tracked by Epoch AI
In the pipeline10 under construction, 1 planned
Home price24.5¢/kWh+25% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
FirstLight Bedford Data Center (formerly ColoSpace) FirstLight Hillsborough Planned – –
Nottingham Business Park Data Center Nottingham Business Park LLC Rockingham Cancelled – –

Local pushback

Bans and moratoriums

3 recorded as enacted, 4 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
New Hampshire (Senate) · Merrimack State Proposed Sep 18, 2026 Term not documented
Nottingham · Rockingham Local Enacted Sep 8, 2026 A stated duration, but the end date isn't recorded here
Bow · Merrimack Town Under Review Sep 1, 2026 Term not documented
Rochester · Strafford Local Enacted Sep 1, 2026 No end date by design — a permanent ban or standing statute
New Hampshire (Ayotte) · Merrimack State Proposed Aug 20, 2026 Term not documented
Keene · Cheshire Local Under Review Jun 18, 2026 Term not documented
New Hampshire (HB 1265) · Merrimack State Defeated Mar 11, 2026 Term not documented
Canterbury · Merrimack Local Enacted Mar 10, 2026 No end date by design — a permanent ban or standing statute

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Rockingham County36.2 h
Hillsborough County24.6 h
Strafford County15.1 h
Grafton County18.0 h

Every named site

The list

7 of 7 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
– University of New Hampshire Strafford Building 0.7
– FirstLight Rockingham Building 0.2
Information Technology Data Center – Rockingham Building 0.2
FirstLight Manchester FirstLight Hillsborough Operator's own list –
Health Dialog Bedford Datacenter – Hillsborough EPA record –
Liberty Mutual Data Center – Rockingham EPA record –
Dartmouth College Data Center – Grafton EPA record –

How many data centers are in New Hampshire?

7 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 42nd most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in New Hampshire?

0 under construction and 1 planned or announced in the Civic Returns and Server Country databases. 1 project has been cancelled.

Which New Hampshire county has the most data centers?

Rockingham County, with 3 operating sites, then Hillsborough County (2) and Strafford County (1).

Who operates data centers in New Hampshire?

Among sites that name an operator: FirstLight (2), University of New Hampshire (1).

What do New Hampshire households pay for electricity?

24.5¢ per kWh on average in 2025 (US: 17.2¢), up 25% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.