Where the power comes from · 2025
New Hampshire
Nuclear made 57% of the electricity generated in New Hampshire in 2025, the 1st highest nuclear share of any state. In 2005, coal made 17% of it; in 2025, 1%.
The mix
New Hampshire's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
New Hampshire's power plants
62 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in New Hampshire, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
New Hampshire's power plants emitted 127 kg of CO₂ for each MWh they generated in 2024, against 337 kg in 2005: the 3rd lowest of 51. 2.2 million metric tons in all.
New Hampshire among the states
- Generation19.1 TWh44th
- Renewable share13%35th
- Carbon-free share70%4th
- Cleanest electricity (kg CO₂/MWh, 2024)1273rd
- Nuclear share57%1st
- Natural gas share28%33rd
- Hydro share5.7%14th
- Other share5.6%10th
More on New Hampshire
Power outage history → Rooftop solar and home batteries → Average electric bills →Plants
The largest plants in New Hampshire
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| Seabrook | Nuclear | Rockingham | 1.2 GW | 11 TWh | 100% | 1990 |
| Granite Ridge | Natural gas | Rockingham | 790 MW | 3.4 TWh | 49% | 2003 |
| Newington Energy Center | Natural gas | Rockingham | 606 MW | 1.9 TWh | 36% | 2002 |
| Merrimack | Coal | Merrimack | 496 MW | 241 GWh | 6% | 1960 |
| Newington | Oil | Rockingham | 414 MW | 132 GWh | 4% | 1974 |
| S C Moore | Hydro | Grafton | 195 MW | 255 GWh | 15% | 1957 |
| Comerford | Hydro | Grafton | 168 MW | 297 GWh | 20% | 1930 |
| Granite Reliable Power | Wind | Coos | 99 MW | 193 GWh | 22% | 2012 |
| Burgess BioPower | Biomass | Coos | 75 MW | 390 GWh | 59% | 2013 |
| Groton Wind LLC | Wind | Grafton | 48 MW | 115 GWh | 27% | 2012 |
| Berlin Gorham | Hydro | Coos | 44 MW | 101 GWh | 26% | 1914 |
| Antrim Wind | Wind | Hillsborough | 29 MW | 78 GWh | 31% | 2019 |
| NE Renewable Tamworth, LLC | Biomass | Carroll | 25 MW | 78 GWh | 36% | 1987 |
| Lempster Wind LLC | Wind | Sullivan | 24 MW | 68 GWh | 32% | 2008 |
| Schiller | Oil | Rockingham | 21 MW | 0.7 GWh | 0% | 1970 |
| Bridgewater Power LP | Biomass | Grafton | 20 MW | 103 GWh | 59% | 1987 |
| NE Renewable Springfield, LLC | Biomass | Sullivan | 20 MW | 73 GWh | 42% | 1987 |
| NE Renewable Whitefield, LLC | Biomass | Coos | 20 MW | 59 GWh | 34% | 1988 |
| White Lake | Oil | Carroll | 19 MW | 0.6 GWh | 0% | 1968 |
| Lost Nation | Oil | Coos | 18 MW | 0.4 GWh | 0% | 1969 |
| NE Renewable Bethlehem, LLC | Biomass | Grafton | 18 MW | 0.0 GWh | – | 1986 |
| Amoskeag | Hydro | Hillsborough | 16 MW | 65 GWh | 46% | 1922 |
| Smith (NH) | Hydro | Coos | 15 MW | 88 GWh | 67% | 1948 |
| Jericho Power | Wind | Coos | 14 MW | 23 GWh | 18% | 2016 |
| Wheelabrator Concord Facility | Biomass | Merrimack | 14 MW | 95 GWh | 77% | 1989 |
| Garvins Falls | Hydro | Merrimack | 12 MW | 25 GWh | 23% | 1925 |
| Pontook Hydro Facility | Hydro | Coos | 11 MW | 51 GWh | 55% | 1986 |
| Turnkey Landfill Gas Recovery | Biomass | Strafford | 9.2 MW | 39 GWh | 48% | 1992 |
| Ayers Island | Hydro | Grafton | 8.4 MW | 36 GWh | 49% | 1925 |
| UNH 7.9 MW Plant | Biomass | Strafford | 7.9 MW | 54 GWh | 78% | 2006 |
| Dartmouth College Heating Plant | Oil | Grafton | 7.0 MW | 10 GWh | 17% | 1970 |
| Eastman Falls | Hydro | Merrimack | 6.4 MW | 22 GWh | 39% | 1937 |
| Hampton Facility | Natural gas | Rockingham | 5.0 MW | 26 GWh | 60% | 2000 |
| Dodge Falls Associates | Hydro | Grafton | 5.0 MW | 22 GWh | 49% | 1990 |
| Penacook Lower Falls | Hydro | Merrimack | 4.6 MW | 16 GWh | 40% | 1983 |
| Rolfe Canal Hydro | Hydro | Merrimack | 4.3 MW | 16 GWh | 43% | 1987 |
| Kearsarge Grissom | Solar | Sullivan | 4.0 MW | – | – | 2026 |
| Gregg Falls | Hydro | Hillsborough | 3.5 MW | 7.7 GWh | 25% | 1985 |
| Penacook Upper Falls Hydro | Hydro | Merrimack | 3.4 MW | 11 GWh | 37% | 1986 |
| Jackman | Hydro | Hillsborough | 3.2 MW | 7.4 GWh | 26% | 1926 |
| Mine Falls Generating Station | Hydro | Hillsborough | 3.0 MW | 9.1 GWh | 35% | 1985 |
| Errol Hydroelectric Project | Hydro | Coos | 3.0 MW | 14 GWh | 52% | 1986 |
| Plymouth State College Cogeneration | Oil | Grafton | 2.8 MW | 0.0 GWh | – | 1994 |
| Pembroke Hydro | Hydro | Merrimack | 2.7 MW | 6.7 GWh | 28% | 1985 |
| Clement Dam Hydro LLC | Hydro | Belknap | 2.4 MW | 6.4 GWh | 30% | 1984 |
| Nashua Plant | Biomass | Hillsborough | 2.4 MW | 13 GWh | 62% | 1996 |
| Merrimack Solar Farm, LLC | Solar | Hillsborough | 2.4 MW | 3.3 GWh | 16% | 2019 |
| Gorham | Hydro | Coos | 2.2 MW | 8.4 GWh | 44% | 1917 |
| Seven Hills New Hampshire | Oil | Hillsborough | 2.1 MW | 0.0 GWh | – | 1990 |
| Blackwater Rd Solar | Solar | Strafford | 2.0 MW | 0.0 GWh | – | 2025 |
| Stevens Mills Dam | Hydro | Merrimack | 1.9 MW | 3.6 GWh | 22% | 1985 |
| China Mill Hydro | Hydro | Merrimack | 1.7 MW | 2.6 GWh | 18% | 1981 |
| Hooksett | Hydro | Merrimack | 1.6 MW | 6.3 GWh | 45% | 1927 |
| Mascoma Hydro | Hydro | Grafton | 1.5 MW | 0.2 GWh | 2% | 1988 |
| Milton Hydro | Hydro | Strafford | 1.4 MW | 4.6 GWh | 38% | 1914 |
| Newfound Hydroelectric | Hydro | Grafton | 1.4 MW | 3.8 GWh | 31% | 1983 |
| Rollinsford | Hydro | Strafford | 1.4 MW | 3.0 GWh | 25% | 1986 |
| Somersworth Lower Great Dam | Hydro | Strafford | 1.3 MW | 0.5 GWh | 4% | 1985 |
| Hillsborough Hosiery | Hydro | Hillsborough | 1.2 MW | 2.3 GWh | 22% | 1989 |
| Lower Village Water Power Project | Hydro | Sullivan | 1.2 MW | 3.5 GWh | 33% | 1995 |
| Lochmere Hydroelectric Plant | Hydro | Belknap | 1.2 MW | 1.8 GWh | 17% | 1984 |
| EHC West Hopkinton | Hydro | Merrimack | 1.0 MW | 1.2 GWh | 14% | 1985 |
Coming next
Planned projects
The largest generators reported as planned in New Hampshire, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Nutes Solar | Solar | Strafford | 20 MW | 2026 |
Shut down
Retired since 2010
The largest generators retired in New Hampshire since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| Schiller | Coal | 50 MW | 2025 |
| Schiller | Biomass | 50 MW | 2025 |
| Schiller | Coal | 50 MW | 2025 |
| Indeck Energy-Alexandria | Biomass | 16 MW | 2021 |
| Hopkinton Energy | Biomass | 13 MW | 2010 |
| Wheelabrator Claremont Facility | Biomass | 4.5 MW | 2013 |
| Nashua Plant | Biomass | 2.2 MW | 2014 |
| General Electric Great Falls Upper Hydro | Hydro | 1.6 MW | 2023 |
| Durgin & Crowell Lumber | Oil | 1.3 MW | 2011 |
| Hampton Facility | Oil | 0.7 MW | 2017 |
| Hampton Facility | Oil | 0.7 MW | 2017 |
| Hampton Facility | Oil | 0.7 MW | 2017 |
| Hampton Facility | Oil | 0.7 MW | 2016 |
| Dunbarton Energy Partners LP | Biomass | 0.7 MW | 2012 |
| Dunbarton Energy Partners LP | Biomass | 0.7 MW | 2012 |
| Tillotson Rubber | Biomass | 0.7 MW | 2011 |
| Tillotson Rubber | Oil | 0.6 MW | 2011 |
| Tillotson Rubber | Biomass | 0.6 MW | 2011 |
| Hampton Facility | Oil | 0.5 MW | 2017 |
| Hampton Facility | Oil | 0.5 MW | 2017 |
| General Electric Great Falls Upper Hydro | Hydro | 0.5 MW | 2023 |
| Tillotson Rubber | Oil | 0.4 MW | 2011 |
| Tillotson Rubber | Hydro | 0.1 MW | 2011 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.