Wind power plant · Hillsborough, NH
Antrim Wind
Antrim Wind is a 29 MW wind power plant in Hillsborough County, New Hampshire, operated by Antrim Wind Energy LLC. Its oldest generator still running came online in 2019. In 2025 it generated 78 GWh, about what 10,000 average New Hampshire homes use in a year.
Antrim Wind in context
Among the 5 wind plants in New Hampshire in the EIA's inventory, it is the 3rd largest, about 13% of the state's 214 MW of wind capacity.
Hillsborough County has 9 power plants of 1 MW or more with 63 MW in all; Antrim Wind is 46% of that.
Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Hillsborough County goes 4.6 hours a year without power, the 10th most of 10 counties in New Hampshire. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Antrim Wind (outlined) and other plants in Hillsborough County, shaded. 43.064, -72.006.
Plant facts
- Operator
- Antrim Wind Energy LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Hillsborough County, NH
- EIA plant ID
- 59953
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| AWND1 | Onshore Wind Turbine | 29 MW | 2019 | – |
Nearby
Other plants in Hillsborough County
Questions
Antrim Wind, answered
How much power does Antrim Wind produce?
Antrim Wind has 29 MW of capacity from one generator. In 2025 it generated 78 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Antrim Wind power?
Its 2025 output of 78 GWh equals the yearly electricity use of about 10,000 average New Hampshire homes (640 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Antrim Wind?
Antrim Wind is in Hillsborough County, New Hampshire, at about 43.064°, -72.006°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Hillsborough County goes 4.6 hours a year without power, the 10th most of 10 counties in New Hampshire. The county's page has the full outage record.
Who operates Antrim Wind?
It is operated by Antrim Wind Energy LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Antrim Wind open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average New Hampshire home's 640 kWh a month in 2025. Methodology.