Coal power plant · Merrimack, NH
Merrimack
Merrimack is a 496 MW coal power plant in Merrimack County, New Hampshire, operated by Granite Shore Power. Its oldest generator still running came online in 1960. In 2025 it generated 241 GWh, about what 31,000 average New Hampshire homes use in a year.
Merrimack in context
Merrimack County has 12 power plants of 1 MW or more with 550 MW in all; Merrimack is 90% of that.
Its capacity factor of 6% in 2025 is lower than the 45% typical for coal plants across the US.
The average electricity customer in Merrimack County goes 5.0 hours a year without power, the 9th most of 10 counties in New Hampshire. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Merrimack (outlined) and other plants in Merrimack County, shaded. 43.141, -71.469.
Plant facts
- Operator
- Granite Shore Power
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Merrimack County, NH
- EIA plant ID
- 2364
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 2 | Conventional Steam Coal | 346 MW | 1968 | 2028 |
| 1 | Conventional Steam Coal | 114 MW | 1960 | 2027 |
| GT1 | Petroleum Liquids | 19 MW | 1968 | – |
| GT2 | Petroleum Liquids | 19 MW | 1969 | – |
Nearby
Other plants in Merrimack County
Questions
Merrimack, answered
How much power does Merrimack produce?
Merrimack has 496 MW of capacity from 4 generators. In 2025 it generated 241 GWh, 6% of the most it could have made running flat out all year (its capacity factor).
How many homes does Merrimack power?
Its 2025 output of 241 GWh equals the yearly electricity use of about 31,000 average New Hampshire homes (640 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Merrimack?
Merrimack is in Merrimack County, New Hampshire, at about 43.141°, -71.469°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Merrimack County goes 5.0 hours a year without power, the 9th most of 10 counties in New Hampshire. The county's page has the full outage record.
Who operates Merrimack?
It is operated by Granite Shore Power (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Merrimack open?
Its oldest generator still running came online in 1960. Planned retirements are scheduled for 2027, 2028.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New Hampshire home's 640 kWh a month in 2025. Methodology.