Hydro power plant · Coos, NH
Berlin Gorham
Berlin Gorham is a 44 MW hydro power plant in Coos County, New Hampshire, operated by Great Lakes Hydro America LLC. Its oldest generator still running came online in 1914. In 2025 it generated 101 GWh, about what 13,000 average New Hampshire homes use in a year.
Berlin Gorham in context
Among the 32 hydro plants in New Hampshire in the EIA's inventory, it is the 3rd largest, about 8.4% of the state's 530 MW of hydro capacity.
Coos County has 10 power plants of 1 MW or more with 301 MW in all; Berlin Gorham is 15% of that and the largest of 5 hydro plants there.
Its capacity factor of 26% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Coos County goes 6.3 hours a year without power, the 6th most of 10 counties in New Hampshire. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Berlin Gorham (outlined) and other plants in Coos County, shaded. 44.389, -71.165.
Plant facts
- Operator
- Great Lakes Hydro America LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Coos County, NH
- EIA plant ID
- 54639
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BESS1 | Batteries | 14 MW · 14 MWh | 2023 | – |
| RS3 | Conventional Hydroelectric | 4.1 MW | 1920 | – |
| RS1 | Conventional Hydroelectric | 3.8 MW | 1920 | – |
| CAS3 | Conventional Hydroelectric | 3.1 MW | 1918 | – |
| CAS1 | Conventional Hydroelectric | 2.4 MW | 1914 | – |
| CAS2 | Conventional Hydroelectric | 2.4 MW | 1916 | – |
| SHL3 | Conventional Hydroelectric | 1.8 MW | 1929 | – |
| GOR1 | Conventional Hydroelectric | 1.2 MW | 1920 | – |
| GOR2 | Conventional Hydroelectric | 1.2 MW | 1920 | – |
| GOR3 | Conventional Hydroelectric | 1.2 MW | 1920 | – |
| GOR4 | Conventional Hydroelectric | 1.2 MW | 1920 | – |
| SH2 | Conventional Hydroelectric | 0.9 MW | 1916 | – |
| SHL1 | Conventional Hydroelectric | 0.9 MW | 1916 | – |
| SM1 | Conventional Hydroelectric | 0.8 MW | 1980 | – |
| SM2 | Conventional Hydroelectric | 0.8 MW | 1980 | – |
| SM4 | Conventional Hydroelectric | 0.8 MW | 1980 | – |
| XP5 | Conventional Hydroelectric | 0.7 MW | 1924 | – |
| SM3 | Conventional Hydroelectric | 0.7 MW | 1980 | – |
| XP1 | Conventional Hydroelectric | 0.6 MW | 1921 | – |
| XP2 | Conventional Hydroelectric | 0.6 MW | 1921 | – |
| XP3 | Conventional Hydroelectric | 0.6 MW | 1921 | – |
| XP4 | Conventional Hydroelectric | 0.5 MW | 1921 | – |
Nearby
Other plants in Coos County
Questions
Berlin Gorham, answered
How much power does Berlin Gorham produce?
Berlin Gorham has 44 MW of capacity from 22 generators. In 2025 it generated 101 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Berlin Gorham power?
Its 2025 output of 101 GWh equals the yearly electricity use of about 13,000 average New Hampshire homes (640 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Berlin Gorham?
Berlin Gorham is in Coos County, New Hampshire, at about 44.389°, -71.165°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Coos County goes 6.3 hours a year without power, the 6th most of 10 counties in New Hampshire. The county's page has the full outage record.
Who operates Berlin Gorham?
It is operated by Great Lakes Hydro America LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Berlin Gorham open?
Its oldest generator still running came online in 1914.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New Hampshire home's 640 kWh a month in 2025. Methodology.