Wind power plant · Sullivan, NH

Lempster Wind LLC

Lempster Wind LLC is a 24 MW wind power plant in Sullivan County, New Hampshire, operated by Avangrid Power LLC. Its oldest generator still running came online in 2008. In 2025 it generated 68 GWh, about what 8,800 average New Hampshire homes use in a year.

Capacity24 MWNameplate, September 2026
Generated68 GWhIn 2025
Capacity factor32%Share of the most it could make, 2025
Generators1Oldest from 2008

Lempster Wind LLC in context

Among the 5 wind plants in New Hampshire in the EIA's inventory, it is the 4th largest, about 11% of the state's 214 MW of wind capacity.

Sullivan County has 4 power plants of 1 MW or more with 49 MW in all; Lempster Wind LLC is 49% of that.

Its capacity factor of 32% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Sullivan County goes 13 hours a year without power, the 3rd most of 10 counties in New Hampshire. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608020182019202020212022202320242025GWh 68
020406080201920212023202568

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Lempster Wind LLC (outlined) and other plants in Sullivan County, shaded. 43.233, -72.145.

Plant facts

Operator
Avangrid Power LLC
Sector
IPP Non-CHP
Grid operator
ISNE
County
Sullivan County, NH
EIA plant ID
56399
Where New Hampshire's power comes from → New Hampshire power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 24 MW 2008 –

Nearby

Other plants in Sullivan County

NE Renewable Springfield, LLC · 20 MWKearsarge Grissom · 4.0 MWLower Village Water Power Project · 1.2 MW

Questions

Lempster Wind LLC, answered

How much power does Lempster Wind LLC produce?

Lempster Wind LLC has 24 MW of capacity from one generator. In 2025 it generated 68 GWh, 32% of the most it could have made running flat out all year (its capacity factor).

How many homes does Lempster Wind LLC power?

Its 2025 output of 68 GWh equals the yearly electricity use of about 8,800 average New Hampshire homes (640 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Lempster Wind LLC?

Lempster Wind LLC is in Sullivan County, New Hampshire, at about 43.233°, -72.145°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Sullivan County goes 13 hours a year without power, the 3rd most of 10 counties in New Hampshire. The county's page has the full outage record.

Who operates Lempster Wind LLC?

It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.

When did Lempster Wind LLC open?

Its oldest generator still running came online in 2008.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New Hampshire home's 640 kWh a month in 2025. Methodology.