Data centers · Oregon

Data centers in Oregon

147 operating data center sites, 9 projects planned or under construction and 2 AI campuses planned to draw 428 MW. Oregon ranks 4th of 51 by mapped sites.

Operating sites1479 whole campuses
AI campuses2334 MW drawn now
In the pipeline93 under construction, 6 planned
Home price15.5¢/kWh+41% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Oregon's AI data centers

CampusOwnerWhereNowPlanned
Meta-QTS Hillsboro 2MetaWashington County180 MW243 MW
Google The DallesGoogleWasco County154 MW185 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Sabey Data Centers Umatilla Campus (SDC Umatilla) Sabey Data Centers Umatilla Under construction 100 MW 2026
Crane Data Centers Forest Grove Campus (PDX01) Crane Data Centers Washington Under construction – 2026
QTS Hillsboro 3 QTS Washington Under construction – –
Percheron Data Center Rowan Green Data Morrow Planned 300 MW 2027
Amazon AWS US West (Oregon) Region - Boardman Amazon Web Services Morrow Planned 266 MW 2031
Amazon AWS Arlington Expansion Amazon Web Services Gilliam Planned – 2028
Amazon Boardman Exascale Data Center Site Amazon Morrow Planned – 2033
Rowan Digital Infrastructure Percheron (300 MW, 275 acres) Rowan Digital Infrastructure Morrow Planned – –
Verrus Oakline at Mill Creek Data Center Campus Verrus Marion Planned – –
Boxminer La Pine Data Center Boxminer.io Deschutes Cancelled – –

Local pushback

Bans and moratoriums

3 recorded as enacted, 4 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Oregon (state land) · Crook State Enacted Sep 8, 2026 to Jul 1, 2027
Clackamas County · Clackamas County Proposed Aug 11, 2026 Term not documented
Oregon (statewide) · Marion State Proposed Aug 4, 2026 Term not documented
Salem · Marion Local Proposed Aug 3, 2026 Term not documented
Woodburn · Marion City Proposed Jul 31, 2026 Term not documented
Hillsboro · Washington Local Enacted Jul 27, 2026 to Nov 24, 2026
Oregon (enterprise zone tax) · Deschutes State Enacted Jun 5, 2026 Runs until a condition is met, not to a date

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Washington County414.0 h
Morrow County382.4 h
Umatilla County363.9 h
Crook County126.6 h
Multnomah County58.3 h
Wasco County41.7 h
Deschutes County31.9 h
Marion County221 h
Jackson County25.4 h
Clackamas County118 h

Every named site

The list

147 of 147 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Google Data Center The Dalles Oregon Google Wasco Campus 34
Google Taylor Lake Data Center Google Wasco Campus 25
Meta Meta Crook Building 14
Meta Meta Crook Building 14
Meta Meta Crook Building 10
Apple Apple Crook Building 8.6
Apple Apple Crook Building 7.9
Apple Prineville Data Center Apple Crook Civic Returns 7.8
Flexential Portland - Hillsboro 3 Flexential Washington Building 7.7
Meta Meta Crook Building 7.5
Digital Realty PDX11 Data Center Digital Realty Washington Building 6.6
Google Google Wasco Building 6.6
Google Google Wasco Building 6.6
Amazon Web Services Amazon Web Services Morrow Building 6.5
Digital Realty PDX11 Data Center Digital Realty Washington Building 6.5
Apple Apple Crook Building 6.3
Amazon Web Services Amazon Web Services Umatilla Building 6.2
Meta Meta Crook Building 6.1
Amazon Web Services Amazon Web Services Morrow Building 6.1
Amazon Web Services Amazon Web Services Morrow Building 6.0
Amazon Web Services Amazon Web Services Umatilla Building 5.9
NTT RagingWire DC - Hillsboro NTT Washington Building 5.9
Percheron DC Rowan Green Data LLC Morrow Campus 5.7
Percheron DC Rowan Green Data LLC Morrow Campus 5.7
Percheron DC Rowan Green Data LLC Morrow Campus 5.7

How many data centers are in Oregon?

147 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 4th most of any state. 9 are mapped as whole campuses. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Oregon?

3 under construction and 6 planned or announced in the Civic Returns and Server Country databases; the 3 that publish a size add up to about 666 MW, besides 2 AI campuses tracked by Epoch AI. 1 project has been cancelled.

Which Oregon county has the most data centers?

Washington County, with 41 operating sites, then Morrow County (38) and Umatilla County (36).

Who operates data centers in Oregon?

Among sites that name an operator: Amazon Web Services (68), Flexential (8), Meta (7), QTS (7), Apple (6).

What AI data centers are in Oregon?

Meta-QTS Hillsboro 2 in Hillsboro (180 MW now, 243 MW planned); Google The Dalles in The Dalles (154 MW now, 185 MW planned), by Epoch AI's estimates.

What do Oregon households pay for electricity?

15.5¢ per kWh on average in 2025 (US: 17.2¢), up 41% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.