Where the power comes from · 2025
Oregon
Hydro made 45% of the electricity generated in Oregon in 2025, the 3rd highest hydro share of any state. In 2005, coal made 7% of it; in 2025, 0%.
The mix
Oregon's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
Oregon's power plants
303 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in Oregon, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
Oregon's power plants emitted 160 kg of CO₂ for each MWh they generated in 2024, against 184 kg in 2005: the 5th lowest of 51. 10 million metric tons in all.
Oregon among the states
- Generation64.4 TWh26th
- Renewable share64%5th
- Carbon-free share64%7th
- Cleanest electricity (kg CO₂/MWh, 2024)1605th
- Hydro share45%3rd
- Natural gas share36%27th
- Wind share14%16th
- Solar share4.2%24th
Plants
The largest plants in Oregon
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| John Day | Hydro | Sherman | 2.2 GW | 7.6 TWh | 40% | 1968 |
| The Dalles | Hydro | Wasco | 1.8 GW | 5.9 TWh | 37% | 1957 |
| Bonneville | Hydro | Multnomah | 1.2 GW | 3.7 TWh | 37% | 1938 |
| McNary | Hydro | Umatilla | 991 MW | 4.0 TWh | 46% | 1953 |
| Hermiston Power Partnership | Natural gas | Umatilla | 689 MW | 3.0 TWh | 50% | 2002 |
| Hermiston Generating Plant | Natural gas | Umatilla | 621 MW | 3.0 TWh | 55% | 1996 |
| Beaver | Natural gas | Columbia | 611 MW | 1.9 TWh | 36% | 1974 |
| Klamath Cogeneration Plant | Natural gas | Klamath | 502 MW | 3.1 TWh | 71% | 2001 |
| Carty Generating Station | Natural gas | Morrow | 500 MW | 3.2 TWh | 72% | 2016 |
| Port Westward | Natural gas | Columbia | 483 MW | 3.3 TWh | 77% | 2007 |
| Biglow Canyon Wind Farm | Wind | Sherman | 450 MW | 901 GWh | 23% | 2007 |
| Hells Canyon | Hydro | Wallowa | 411 MW | 2.0 TWh | 56% | 1967 |
| Round Butte | Hydro | Jefferson | 373 MW | 772 GWh | 24% | 1964 |
| Klondike Windpower III | Wind | Sherman | 298 MW | 707 GWh | 27% | 2007 |
| Coyote Springs | Natural gas | Morrow | 296 MW | 2.0 TWh | 78% | 1995 |
| South Hurlburt Wind LLC | Wind | Gilliam | 290 MW | 564 GWh | 22% | 2012 |
| Horseshoe Bend Wind LLC | Wind | Gilliam | 290 MW | 592 GWh | 23% | 2012 |
| Coyote Springs II | Natural gas | Morrow | 287 MW | 2.2 TWh | 86% | 2003 |
| Wheatridge Hybrid | Wind | Morrow | 280 MW | 668 GWh | 27% | 2020 |
| North Hurlburt Wind LLC | Wind | Gilliam | 265 MW | 517 GWh | 22% | 2012 |
| Port Westward Unit 2 | Natural gas | Columbia | 226 MW | 1.1 TWh | 56% | 2014 |
| Golden Hill Wind | Wind | Sherman | 201 MW | 611 GWh | 35% | 2022 |
| Montague Wind Power Facility LLC | Wind | Gilliam | 200 MW | 483 GWh | 28% | 2019 |
| Wheatridge East Wind | Wind | Morrow | 200 MW | 270 GWh | – | 2025 |
| Seaside BESS | Storage | Multnomah | 200 MW | -10.6 GWh | – | 2025 |
| Sundial (Troutdale) BESS | Storage | Multnomah | 200 MW | -33.4 GWh | – | 2024 |
| Leaning Juniper Wind Power II | Wind | Gilliam | 199 MW | 297 GWh | 17% | 2011 |
| Oxbow (OR) | Hydro | Baker | 190 MW | 990 GWh | 60% | 1961 |
| Montague Solar | Solar | Gilliam | 162 MW | 379 GWh | 27% | 2023 |
| Daybreak Solar | Solar | Wasco | 152 MW | 315 GWh | – | 2025 |
| FPL Energy Vansycle LLC (OR) | Wind | Umatilla | 123 MW | 225 GWh | 21% | 2001 |
| Lookout Point | Hydro | Lane | 120 MW | 227 GWh | 22% | 1955 |
| Tower Solar, LLC | Solar | Morrow | 120 MW | – | – | 2026 |
| Klamath Expansion Project | Natural gas | Klamath | 118 MW | 9.2 GWh | 1% | 2002 |
| Carmen Smith | Hydro | Linn | 114 MW | 168 GWh | 17% | 1963 |
| Leaning Juniper | Wind | Gilliam | 110 MW | 270 GWh | 28% | 2006 |
| Pelton | Hydro | Jefferson | 110 MW | 400 GWh | 42% | 1957 |
| Wheat Field Wind Power Project | Wind | Gilliam | 103 MW | 198 GWh | 22% | 2009 |
| Arlington Wind Power Project | Wind | Gilliam | 103 MW | 199 GWh | 22% | 2008 |
| Vansycle II Wind Energy Center | Wind | Umatilla | 102 MW | 320 GWh | 36% | 2009 |
| Hay Canyon Wind Power LLC | Wind | Sherman | 101 MW | 172 GWh | 20% | 2009 |
| Elkhorn Valley Wind Farm | Wind | Union | 101 MW | 306 GWh | 35% | 2007 |
| Detroit | Hydro | Marion | 100 MW | 227 GWh | 26% | 1953 |
| Wheatridge 1 | Wind | Morrow | 100 MW | 250 GWh | 29% | 2020 |
| Pebble Springs Wind LLC | Wind | Gilliam | 99 MW | 194 GWh | 23% | 2009 |
| Star Point Wind Project LLC | Wind | Sherman | 99 MW | 201 GWh | 23% | 2010 |
| Green Peter | Hydro | Linn | 80 MW | 116 GWh | 17% | 1967 |
| Klondike Windpower II | Wind | Sherman | 75 MW | 236 GWh | 36% | 2005 |
| Constable BESS | Storage | Washington | 75 MW | -10.8 GWh | – | 2024 |
| Willow Creek Energy Center | Wind | Morrow | 72 MW | 158 GWh | 25% | 2009 |
| Millican Solar Energy LLC | Solar | Crook | 70 MW | 143 GWh | 23% | 2021 |
| Eurus Combine Hills Turbine Ranch 2 | Wind | Umatilla | 66 MW | 137 GWh | 24% | 2010 |
| Skysol | Solar | Klamath | 61 MW | 118 GWh | 22% | 2023 |
| Bakeoven Solar | Solar | Wasco | 60 MW | 72 GWh | 14% | 2023 |
| Solar Star Oregon II | Solar | Crook | 56 MW | 125 GWh | 25% | 2017 |
| Dillard Complex | Biomass | Douglas | 52 MW | 114 GWh | 25% | 1955 |
| Oak Grove | Hydro | Clackamas | 51 MW | 142 GWh | 32% | 1924 |
| Condon Windpower LLC | Wind | Gilliam | 50 MW | 73 GWh | 17% | 2001 |
| Lost Creek | Hydro | Jackson | 49 MW | 221 GWh | 52% | 1977 |
| Airport Solar | Solar | Lake | 47 MW | 104 GWh | 25% | 2019 |
| Cartwright Solar I | Solar | Crook | 44 MW | – | – | 2026 |
| Lemolo 2 | Hydro | Douglas | 44 MW | 150 GWh | 39% | 1956 |
| Combine Hills I | Wind | Umatilla | 43 MW | 61 GWh | 16% | 2003 |
| Toketee Falls | Hydro | Douglas | 43 MW | 208 GWh | 56% | 1949 |
| North Fork | Hydro | Clackamas | 41 MW | 164 GWh | 46% | 1958 |
| Biomass One LP | Biomass | Jackson | 40 MW | 199 GWh | 57% | 1985 |
| Prineville Solar Energy LLC | Solar | Crook | 40 MW | 98 GWh | 28% | 2021 |
| Faraday | Hydro | Clackamas | 37 MW | 133 GWh | 41% | 1958 |
| Neal Hot Springs Geothermal Project | Geothermal | Malheur | 33 MW | 152 GWh | 53% | 2012 |
| IP Springfield Oregon | Biomass | Lane | 33 MW | 181 GWh | 63% | 1976 |
| Lemolo 1 | Hydro | Douglas | 32 MW | 120 GWh | 43% | 1955 |
| Prospect 2 | Hydro | Jackson | 32 MW | 180 GWh | 64% | 1928 |
| Hills Creek | Hydro | Lane | 30 MW | 116 GWh | 44% | 1962 |
| Georgia-Pacific Wauna Mill | Biomass | Clatsop | 30 MW | 168 GWh | 64% | 1996 |
| Clearwater 2 | Hydro | Douglas | 26 MW | 31 GWh | 13% | 1953 |
| Cougar | Hydro | Lane | 26 MW | 72 GWh | 32% | 1964 |
| Vansycle | Wind | Umatilla | 25 MW | 55 GWh | 25% | 1998 |
| Klondike Wind Power | Wind | Sherman | 25 MW | 17 GWh | 8% | 2002 |
| PHP 1 | Hydro | Multnomah | 24 MW | 38 GWh | 18% | 1982 |
| Evergreen BioPower LLC | Biomass | Linn | 21 MW | 48 GWh | 26% | 2007 |
| Univ of Oregon Central Power Station | Natural gas | Lane | 21 MW | 0.6 GWh | – | 2009 |
| Foster | Hydro | Linn | 20 MW | 65 GWh | 37% | 1968 |
| Seneca Sustainable Energy LLC | Biomass | Lane | 20 MW | 121 GWh | 70% | 2011 |
| Warm Springs Power Enterprises | Hydro | Jefferson | 20 MW | 71 GWh | 41% | 1982 |
| River Mill | Hydro | Clackamas | 19 MW | 77 GWh | 47% | 1911 |
| Georgia-Pacific Toledo Mill | Biomass | Lincoln | 19 MW | 47 GWh | 28% | 2007 |
| Slide Creek | Hydro | Douglas | 18 MW | 57 GWh | 36% | 1951 |
| Big Cliff | Hydro | Marion | 18 MW | 61 GWh | 39% | 1954 |
| Green Springs | Hydro | Jackson | 17 MW | 35 GWh | 23% | 1960 |
| Coffee Creek BESS | Storage | Washington | 17 MW | -1.0 GWh | – | 2024 |
| Sullivan | Hydro | Clackamas | 15 MW | 85 GWh | 63% | 1924 |
| Clearwater 1 | Hydro | Douglas | 15 MW | 35 GWh | 27% | 1953 |
| Dexter | Hydro | Lane | 15 MW | 43 GWh | 33% | 1955 |
| Baker City Solar | Solar | Baker | 15 MW | 30 GWh | 23% | 2020 |
| Waste Management Columbia Ridge LFGTE | Biomass | Gilliam | 13 MW | 20 GWh | 18% | 2009 |
| Stone Creek | Hydro | Clackamas | 12 MW | 54 GWh | 52% | 1994 |
| PHP 2 | Hydro | Clackamas | 12 MW | 26 GWh | 25% | 1982 |
| Fish Creek | Hydro | Douglas | 11 MW | 29 GWh | 30% | 1952 |
| Soda Springs | Hydro | Douglas | 11 MW | 52 GWh | 54% | 1952 |
| Four Mile Canyon Windfarm LLC | Wind | Morrow | 10 MW | 20 GWh | 23% | 2009 |
Coming next
Planned projects
The largest generators reported as planned in Oregon, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Sunstone Solar | Storage | Morrow | 1.2 GW | 2027 |
| Sunstone Solar | Solar | Morrow | 1.2 GW | 2027 |
| Deschutes Solar and BESS | Solar | Wasco | 1.0 GW | 2029 |
| Deschutes Solar and BESS | Storage | Wasco | 1.0 GW | 2029 |
| Cedar Island Solar LLC | Solar | Sherman | 800 MW | 2031 |
| Obsidian Solar Center | Solar | Lake | 400 MW | 2028 |
| Nolin Hills | Wind | Umatilla | 300 MW | 2027 |
| Nolin Hills | Solar | Umatilla | 300 MW | 2027 |
| Salmonfly Solar and Storage | Solar | Jefferson | 247 MW | 2029 |
| Salmonfly Solar and Storage | Storage | Jefferson | 247 MW | 2029 |
| Tualatin Battery Energy Storage System | Storage | Washington | 200 MW | 2027 |
| Wheatridge Optimization II | Solar | Morrow | 130 MW | 2027 |
| Biglow Solar Generation and BESS | Solar | Sherman | 125 MW | 2027 |
| Biglow Solar Generation and BESS | Storage | Sherman | 125 MW | 2027 |
| Wheatridge Optimization I | Solar | Morrow | 110 MW | 2027 |
| Sunset Solar | Solar | Wasco | 103 MW | 2028 |
| Wheatridge Optimization I | Storage | Morrow | 65 MW | 2027 |
| Wheatridge Optimization II | Storage | Morrow | 60 MW | 2027 |
| Powell Solar | Solar | Crook | 56 MW | 2027 |
| Oregon Trail Solar | Solar | Gilliam | 41 MW | 2027 |
| Shutler Energy Storage | Storage | Gilliam | 41 MW | 2028 |
| Cartwright Solar II | Solar | Crook | 18 MW | 2026 |
| Fry Ontario Solar Project | Solar | Malheur | 4.2 MW | 2027 |
| Canyonville Solar LLC (CSG) | Solar | Douglas | 2.5 MW | 2027 |
| Buckaroo Solar 1 | Solar | Umatilla | 2.4 MW | 2027 |
| OIT BESS | Storage | Klamath | 2.0 MW | 2027 |
| Tutuilla Solar | Solar | Umatilla | 1.6 MW | 2026 |
Shut down
Retired since 2010
The largest generators retired in Oregon since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| Boardman | Coal | 642 MW | 2020 |
| John C Boyle | Hydro | 50 MW | 2024 |
| John C Boyle | Hydro | 48 MW | 2024 |
| SPFT - Newberg Cogen | Biomass | 43 MW | 2016 |
| Georgia-Pacific Toledo Mill | Biomass | 19 MW | 2013 |
| Covanta Marion Inc | Biomass | 13 MW | 2024 |
| IP Springfield Oregon | Biomass | 13 MW | 2025 |
| SPFT - Newberg Cogen | Biomass | 13 MW | 2015 |
| Alden Bailey Power Plant | Natural gas | 11 MW | 2021 |
| Leaburg | Hydro | 8.4 MW | 2023 |
| IP Springfield Oregon | Biomass | 7.5 MW | 2025 |
| Leaburg | Hydro | 7.5 MW | 2023 |
| IP Springfield Oregon | Biomass | 5.0 MW | 2025 |
| Salem Smart Power Center | Storage | 5.0 MW | 2024 |
| Faraday | Hydro | 4.5 MW | 2019 |
| Faraday | Hydro | 4.0 MW | 2019 |
| Faraday | Hydro | 3.1 MW | 2019 |
| Faraday | Hydro | 3.1 MW | 2019 |
| Warm Springs Forest Products | Biomass | 3.0 MW | 2016 |
| Warm Springs Forest Products | Biomass | 3.0 MW | 2016 |
| Warm Springs Forest Products | Biomass | 3.0 MW | 2016 |
| Faraday | Hydro | 2.7 MW | 2019 |
| Copper Dam Plant | Hydro | 2.0 MW | 2015 |
| Dry Creek LFG to Energy Project | Biomass | 1.6 MW | 2026 |
| Dry Creek LFG to Energy Project | Biomass | 1.6 MW | 2026 |
| Threemile Digester | Natural gas | 1.6 MW | 2026 |
| Threemile Digester | Natural gas | 1.6 MW | 2026 |
| Threemile Digester | Natural gas | 1.6 MW | 2026 |
| R & R Lumber | Biomass | 1.5 MW | 2016 |
| Copper Dam Plant | Hydro | 1.0 MW | 2015 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.