Wind power plant · Morrow, OR
Wheatridge Hybrid
Wheatridge Hybrid is a 280 MW wind power plant in Morrow County, Oregon, operated by Wheatridge Wind Holdings, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 668 GWh, about what 64,000 average Oregon homes use in a year.
Wheatridge Hybrid in context
Among the 50 wind plants in Oregon in the EIA's inventory, it is the 5th largest, about 6.6% of the state's 4.3 GW of wind capacity.
Morrow County has 19 power plants of 1 MW or more with 1.9 GW in all; Wheatridge Hybrid is 14% of that and the largest of 14 wind plants there.
Its capacity factor of 27% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Morrow County goes 2.4 hours a year without power, the 30th most of 32 counties in Oregon. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Wheatridge Hybrid (outlined) and other plants in Morrow County, shaded. 45.560, -119.634.
Plant facts
- Operator
- Wheatridge Wind Holdings, LLC
- Sector
- IPP Non-CHP
- Grid operator
- BPAT
- County
- Morrow County, OR
- EIA plant ID
- 62745
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WIND | Onshore Wind Turbine | 200 MW | 2020 | – |
| SOLAR | Solar Photovoltaic | 50 MW | 2022 | – |
| BTRY | Batteries | 30 MW · 120 MWh | 2022 | – |
Questions
Wheatridge Hybrid, answered
How much power does Wheatridge Hybrid produce?
Wheatridge Hybrid has 280 MW of capacity from 3 generators. In 2025 it generated 668 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Wheatridge Hybrid power?
Its 2025 output of 668 GWh equals the yearly electricity use of about 64,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Wheatridge Hybrid?
Wheatridge Hybrid is in Morrow County, Oregon, at about 45.560°, -119.634°. It is one of 19 power plants of 1 MW or more in the county. The average electricity customer in Morrow County goes 2.4 hours a year without power, the 30th most of 32 counties in Oregon. The county's page has the full outage record.
Who operates Wheatridge Hybrid?
It is operated by Wheatridge Wind Holdings, LLC (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.
When did Wheatridge Hybrid open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.