Tower Solar, LLC is a 120 MW solar power plant in Morrow County, Oregon, operated by Avangrid Power LLC. Its oldest generator still running came online in 2026.

Capacity120 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Tower Solar, LLC in context

Among the 151 solar plants in Oregon in the EIA's inventory, it is the 3rd largest, about 8.5% of the state's 1.4 GW of solar capacity.

Morrow County has 19 power plants of 1 MW or more with 1.9 GW in all; Tower Solar, LLC is 6% of that.

The average electricity customer in Morrow County goes 2.4 hours a year without power, the 30th most of 32 counties in Oregon. The county's page has the full outage record.

Where it is

Tower Solar, LLC (outlined) and other plants in Morrow County, shaded. 45.821, -119.799.

Plant facts

Operator
Avangrid Power LLC
Sector
IPP Non-CHP
Grid operator
BPAT
County
Morrow County, OR
EIA plant ID
68329
Where Oregon's power comes from → Oregon power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
TWS Solar Photovoltaic 120 MW 2026 –

Questions

Tower Solar, LLC, answered

How much power does Tower Solar, LLC produce?

Tower Solar, LLC has 120 MW of capacity from one generator. No full year of generation is reported yet.

Where is Tower Solar, LLC?

Tower Solar, LLC is in Morrow County, Oregon, at about 45.821°, -119.799°. It is one of 19 power plants of 1 MW or more in the county. The average electricity customer in Morrow County goes 2.4 hours a year without power, the 30th most of 32 counties in Oregon. The county's page has the full outage record.

Who operates Tower Solar, LLC?

It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.

When did Tower Solar, LLC open?

Its oldest generator still running came online in 2026.