Wind power plant · Morrow, OR

Wheatridge East Wind

Wheatridge East Wind is a 200 MW wind power plant in Morrow County, Oregon, operated by Wheatridge East Wind LLC. Its oldest generator still running came online in 2025. In 2025 it generated 270 GWh, about what 26,000 average Oregon homes use in a year.

Capacity200 MWNameplate, September 2026
Generated270 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Wheatridge East Wind in context

Among the 50 wind plants in Oregon in the EIA's inventory, it is the 9th largest, about 4.7% of the state's 4.3 GW of wind capacity.

Morrow County has 19 power plants of 1 MW or more with 1.9 GW in all; Wheatridge East Wind is 10% of that and the 2nd largest of 14 wind plants there.

The average electricity customer in Morrow County goes 2.4 hours a year without power, the 30th most of 32 counties in Oregon. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Wheatridge East Wind (outlined) and other plants in Morrow County, shaded. 45.543, -119.382.

Plant facts

Operator
Wheatridge East Wind LLC
Sector
IPP Non-CHP
Grid operator
BPAT
County
Morrow County, OR
EIA plant ID
66560
Where Oregon's power comes from → Oregon power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WREW Onshore Wind Turbine 200 MW 2025 –

Questions

Wheatridge East Wind, answered

How much power does Wheatridge East Wind produce?

Wheatridge East Wind has 200 MW of capacity from one generator. In 2025 it generated 270 GWh.

How many homes does Wheatridge East Wind power?

Its 2025 output of 270 GWh equals the yearly electricity use of about 26,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Wheatridge East Wind?

Wheatridge East Wind is in Morrow County, Oregon, at about 45.543°, -119.382°. It is one of 19 power plants of 1 MW or more in the county. The average electricity customer in Morrow County goes 2.4 hours a year without power, the 30th most of 32 counties in Oregon. The county's page has the full outage record.

Who operates Wheatridge East Wind?

It is operated by Wheatridge East Wind LLC (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.

When did Wheatridge East Wind open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.