Wind power plant · Morrow, OR
Four Mile Canyon Windfarm LLC
Four Mile Canyon Windfarm LLC is a 10 MW wind power plant in Morrow County, Oregon, operated by Echo 2. Its oldest generator still running came online in 2009. In 2025 it generated 20 GWh, about what 2,000 average Oregon homes use in a year.
Four Mile Canyon Windfarm LLC in context
Among the 50 wind plants in Oregon in the EIA's inventory, it is the 28th largest, about 0.2% of the state's 4.3 GW of wind capacity.
Morrow County has 19 power plants of 1 MW or more with 1.9 GW in all; Four Mile Canyon Windfarm LLC is 1% of that and the 5th largest of 14 wind plants there.
Its capacity factor of 23% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Morrow County goes 2.4 hours a year without power, the 30th most of 32 counties in Oregon. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Four Mile Canyon Windfarm LLC (outlined) and other plants in Morrow County, shaded. 45.645, -119.453.
Plant facts
- Operator
- Echo 2
- Sector
- IPP Non-CHP
- Grid operator
- PACW
- County
- Morrow County, OR
- EIA plant ID
- 56970
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 10 MW | 2009 | – |
Questions
Four Mile Canyon Windfarm LLC, answered
How much power does Four Mile Canyon Windfarm LLC produce?
Four Mile Canyon Windfarm LLC has 10 MW of capacity from one generator. In 2025 it generated 20 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Four Mile Canyon Windfarm LLC power?
Its 2025 output of 20 GWh equals the yearly electricity use of about 2,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Four Mile Canyon Windfarm LLC?
Four Mile Canyon Windfarm LLC is in Morrow County, Oregon, at about 45.645°, -119.453°. It is one of 19 power plants of 1 MW or more in the county. The average electricity customer in Morrow County goes 2.4 hours a year without power, the 30th most of 32 counties in Oregon. The county's page has the full outage record.
Who operates Four Mile Canyon Windfarm LLC?
It is operated by Echo 2 (EIA sector: IPP Non-CHP), and it feeds PacifiCorp West.
When did Four Mile Canyon Windfarm LLC open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.