Biomass power plant · Lincoln, OR
Georgia-Pacific Toledo Mill
Georgia-Pacific Toledo Mill is a 19 MW biomass power plant in Lincoln County, Oregon, operated by Georgia-Pacific Toledo LLC. Its oldest generator still running came online in 2007. In 2025 it generated 47 GWh, about what 4,500 average Oregon homes use in a year.
Georgia-Pacific Toledo Mill in context
Among the 23 other-fuel plants in Oregon in the EIA's inventory, it is the 8th largest, about 5.9% of the state's 319 MW of other-fuel capacity.
Its capacity factor of 28% in 2025 is close to the 25% typical for biomass plants across the US.
The average electricity customer in Lincoln County goes 15 hours a year without power, the 3rd most of 32 counties in Oregon. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Georgia-Pacific Toledo Mill (outlined) and other plants in Lincoln County, shaded. 44.612, -123.932.
Plant facts
- Operator
- Georgia-Pacific Toledo LLC
- Sector
- Industrial CHP
- Grid operator
- BPAT
- County
- Lincoln County, OR
- EIA plant ID
- 58109
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TG2 | Wood/Wood Waste Biomass | 19 MW | 2007 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| TG1 | Wood/Wood Waste Biomass | 19 MW | 2007 | 2013 |
Questions
Georgia-Pacific Toledo Mill, answered
How much power does Georgia-Pacific Toledo Mill produce?
Georgia-Pacific Toledo Mill has 19 MW of capacity from one generator. In 2025 it generated 47 GWh, 28% of the most it could have made running flat out all year (its capacity factor).
How many homes does Georgia-Pacific Toledo Mill power?
Its 2025 output of 47 GWh equals the yearly electricity use of about 4,500 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Georgia-Pacific Toledo Mill?
Georgia-Pacific Toledo Mill is in Lincoln County, Oregon, at about 44.612°, -123.932°. The average electricity customer in Lincoln County goes 15 hours a year without power, the 3rd most of 32 counties in Oregon. The county's page has the full outage record.
Who operates Georgia-Pacific Toledo Mill?
It is operated by Georgia-Pacific Toledo LLC (EIA sector: Industrial CHP), and it feeds the Bonneville Power Administration.
When did Georgia-Pacific Toledo Mill open?
Its oldest generator still running came online in 2007.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.