Wind power plant · Sherman, OR
Golden Hill Wind
Golden Hill Wind is a 201 MW wind power plant in Sherman County, Oregon, operated by Avangrid Power LLC. Its oldest generator still running came online in 2022. In 2025 it generated 611 GWh, about what 59,000 average Oregon homes use in a year.
Golden Hill Wind in context
Among the 50 wind plants in Oregon in the EIA's inventory, it is the 7th largest, about 4.7% of the state's 4.3 GW of wind capacity.
Sherman County has 10 power plants of 1 MW or more with 3.4 GW in all; Golden Hill Wind is 6% of that and the 3rd largest of 8 wind plants there.
Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Sherman County goes 6.9 hours a year without power, the 12th most of 32 counties in Oregon. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Golden Hill Wind (outlined) and other plants in Sherman County, shaded. 45.563, -120.709.
Plant facts
- Operator
- Avangrid Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- AVRN
- County
- Sherman County, OR
- EIA plant ID
- 63710
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GH1 | Onshore Wind Turbine | 201 MW | 2022 | – |
Questions
Golden Hill Wind, answered
How much power does Golden Hill Wind produce?
Golden Hill Wind has 201 MW of capacity from one generator. In 2025 it generated 611 GWh, 35% of the most it could have made running flat out all year (its capacity factor).
How many homes does Golden Hill Wind power?
Its 2025 output of 611 GWh equals the yearly electricity use of about 59,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Golden Hill Wind?
Golden Hill Wind is in Sherman County, Oregon, at about 45.563°, -120.709°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Sherman County goes 6.9 hours a year without power, the 12th most of 32 counties in Oregon. The county's page has the full outage record.
Who operates Golden Hill Wind?
It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority AVRN.
When did Golden Hill Wind open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.