Wind power plant · Sherman, OR
Klondike Windpower II
Klondike Windpower II is a 75 MW wind power plant in Sherman County, Oregon, operated by Avangrid Power LLC. Its oldest generator still running came online in 2005. In 2025 it generated 236 GWh, about what 23,000 average Oregon homes use in a year.
Klondike Windpower II in context
Among the 50 wind plants in Oregon in the EIA's inventory, it is the 21st largest, about 1.8% of the state's 4.3 GW of wind capacity.
Sherman County has 10 power plants of 1 MW or more with 3.4 GW in all; Klondike Windpower II is 2% of that and the 6th largest of 8 wind plants there.
Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Sherman County goes 6.9 hours a year without power, the 12th most of 32 counties in Oregon. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Klondike Windpower II (outlined) and other plants in Sherman County, shaded. 45.571, -120.593.
Plant facts
- Operator
- Avangrid Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- AVRN
- County
- Sherman County, OR
- EIA plant ID
- 56359
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PH2 | Onshore Wind Turbine | 75 MW | 2005 | – |
Questions
Klondike Windpower II, answered
How much power does Klondike Windpower II produce?
Klondike Windpower II has 75 MW of capacity from one generator. In 2025 it generated 236 GWh, 36% of the most it could have made running flat out all year (its capacity factor).
How many homes does Klondike Windpower II power?
Its 2025 output of 236 GWh equals the yearly electricity use of about 23,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Klondike Windpower II?
Klondike Windpower II is in Sherman County, Oregon, at about 45.571°, -120.593°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Sherman County goes 6.9 hours a year without power, the 12th most of 32 counties in Oregon. The county's page has the full outage record.
Who operates Klondike Windpower II?
It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority AVRN.
When did Klondike Windpower II open?
Its oldest generator still running came online in 2005.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.