Solar power plant · Sherman, OR

WyEast Solar

WyEast Solar is a 10 MW solar power plant in Sherman County, Oregon, operated by Avangrid Power LLC. Its oldest generator still running came online in 2018. In 2025 it generated 23 GWh, about what 2,300 average Oregon homes use in a year.

Capacity10 MWNameplate, September 2026
Generated23 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2018

WyEast Solar in context

Among the 151 solar plants in Oregon in the EIA's inventory, it is the 18th largest, about 0.7% of the state's 1.4 GW of solar capacity.

Sherman County has 10 power plants of 1 MW or more with 3.4 GW in all; WyEast Solar is 0% of that.

Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Sherman County goes 6.9 hours a year without power, the 12th most of 32 counties in Oregon. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010203020182019202020212022202320242025GWh 23
0102030201920212023202523

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

WyEast Solar (outlined) and other plants in Sherman County, shaded. 45.585, -120.600.

Plant facts

Operator
Avangrid Power LLC
Sector
IPP Non-CHP
Grid operator
AVRN
County
Sherman County, OR
EIA plant ID
61345
Where Oregon's power comes from → Oregon power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 10 MW 2018 –

Questions

WyEast Solar, answered

How much power does WyEast Solar produce?

WyEast Solar has 10 MW of capacity from one generator. In 2025 it generated 23 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does WyEast Solar power?

Its 2025 output of 23 GWh equals the yearly electricity use of about 2,300 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is WyEast Solar?

WyEast Solar is in Sherman County, Oregon, at about 45.585°, -120.600°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Sherman County goes 6.9 hours a year without power, the 12th most of 32 counties in Oregon. The county's page has the full outage record.

Who operates WyEast Solar?

It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority AVRN.

When did WyEast Solar open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.