Wind power plant · Sherman, OR
Klondike Windpower III
Klondike Windpower III is a 298 MW wind power plant in Sherman County, Oregon, operated by Avangrid Power LLC. Its oldest generator still running came online in 2007. In 2025 it generated 707 GWh, about what 68,000 average Oregon homes use in a year.
Klondike Windpower III in context
Among the 50 wind plants in Oregon in the EIA's inventory, it is the 2nd largest, about 7.0% of the state's 4.3 GW of wind capacity.
Sherman County has 10 power plants of 1 MW or more with 3.4 GW in all; Klondike Windpower III is 9% of that and the 2nd largest of 8 wind plants there.
Its capacity factor of 27% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Sherman County goes 6.9 hours a year without power, the 12th most of 32 counties in Oregon. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Klondike Windpower III (outlined) and other plants in Sherman County, shaded. 45.584, -120.504.
Plant facts
- Operator
- Avangrid Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- AVRN
- County
- Sherman County, OR
- EIA plant ID
- 56468
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 221 MW | 2007 | – |
| 2 | Onshore Wind Turbine | 77 MW | 2008 | – |
Questions
Klondike Windpower III, answered
How much power does Klondike Windpower III produce?
Klondike Windpower III has 298 MW of capacity from 2 generators. In 2025 it generated 707 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Klondike Windpower III power?
Its 2025 output of 707 GWh equals the yearly electricity use of about 68,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Klondike Windpower III?
Klondike Windpower III is in Sherman County, Oregon, at about 45.584°, -120.504°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Sherman County goes 6.9 hours a year without power, the 12th most of 32 counties in Oregon. The county's page has the full outage record.
Who operates Klondike Windpower III?
It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority AVRN.
When did Klondike Windpower III open?
Its oldest generator still running came online in 2007.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.