Wind power plant · Sherman, OR
Biglow Canyon Wind Farm
Biglow Canyon Wind Farm is a 450 MW wind power plant in Sherman County, Oregon, operated by Portland General Electric Co. Its oldest generator still running came online in 2007. In 2025 it generated 901 GWh, about what 87,000 average Oregon homes use in a year.
Biglow Canyon Wind Farm in context
Among the 50 wind plants in Oregon in the EIA's inventory, it is the largest, about 11% of the state's 4.3 GW of wind capacity.
Sherman County has 10 power plants of 1 MW or more with 3.4 GW in all; Biglow Canyon Wind Farm is 13% of that and the largest of 8 wind plants there.
Its capacity factor of 23% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Sherman County goes 6.9 hours a year without power, the 12th most of 32 counties in Oregon. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Biglow Canyon Wind Farm (outlined) and other plants in Sherman County, shaded. 45.654, -120.603.
Plant facts
- Operator
- Portland General Electric Co
- Sector
- Electric Utility
- Grid operator
- PGE
- County
- Sherman County, OR
- EIA plant ID
- 56485
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 2 | Onshore Wind Turbine | 163 MW | 2009 | – |
| 3 | Onshore Wind Turbine | 161 MW | 2010 | – |
| 1 | Onshore Wind Turbine | 125 MW | 2007 | – |
Questions
Biglow Canyon Wind Farm, answered
How much power does Biglow Canyon Wind Farm produce?
Biglow Canyon Wind Farm has 450 MW of capacity from 3 generators. In 2025 it generated 901 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Biglow Canyon Wind Farm power?
Its 2025 output of 901 GWh equals the yearly electricity use of about 87,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Biglow Canyon Wind Farm?
Biglow Canyon Wind Farm is in Sherman County, Oregon, at about 45.654°, -120.603°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Sherman County goes 6.9 hours a year without power, the 12th most of 32 counties in Oregon. The county's page has the full outage record.
Who operates Biglow Canyon Wind Farm?
It is operated by Portland General Electric Co (EIA sector: Electric Utility), and it feeds Portland General Electric.
When did Biglow Canyon Wind Farm open?
Its oldest generator still running came online in 2007.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.