Wind power plant · Baker, OR
Willow Spring Windfarm (Burnt River)
Willow Spring Windfarm (Burnt River) is a 10 MW wind power plant in Baker County, Oregon, operated by Willow Spring. Its oldest generator still running came online in 2017. In 2025 it generated 31 GWh, about what 2,900 average Oregon homes use in a year.
Willow Spring Windfarm (Burnt River) in context
Among the 50 wind plants in Oregon in the EIA's inventory, it is the 34th largest, about 0.2% of the state's 4.3 GW of wind capacity.
Baker County has 9 power plants of 1 MW or more with 261 MW in all; Willow Spring Windfarm (Burnt River) is 4% of that and the 5th largest of 6 wind plants there.
Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Baker County goes 4.8 hours a year without power, the 20th most of 32 counties in Oregon. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Willow Spring Windfarm (Burnt River) (outlined) and other plants in Baker County, shaded. 44.382, -117.273.
Plant facts
- Operator
- Willow Spring
- Sector
- IPP Non-CHP
- Grid operator
- IPCO
- County
- Baker County, OR
- EIA plant ID
- 59494
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WSW | Onshore Wind Turbine | 10 MW | 2017 | – |
Nearby
Other plants in Baker County
Questions
Willow Spring Windfarm (Burnt River), answered
How much power does Willow Spring Windfarm (Burnt River) produce?
Willow Spring Windfarm (Burnt River) has 10 MW of capacity from one generator. In 2025 it generated 31 GWh, 35% of the most it could have made running flat out all year (its capacity factor).
How many homes does Willow Spring Windfarm (Burnt River) power?
Its 2025 output of 31 GWh equals the yearly electricity use of about 2,900 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Willow Spring Windfarm (Burnt River)?
Willow Spring Windfarm (Burnt River) is in Baker County, Oregon, at about 44.382°, -117.273°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Baker County goes 4.8 hours a year without power, the 20th most of 32 counties in Oregon. The county's page has the full outage record.
Who operates Willow Spring Windfarm (Burnt River)?
It is operated by Willow Spring (EIA sector: IPP Non-CHP), and it feeds Idaho Power.
When did Willow Spring Windfarm (Burnt River) open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.