Solar power plant · Crook, OR

Cartwright Solar I

Cartwright Solar I is a 44 MW solar power plant in Crook County, Oregon, operated by Cartwright Solar I LLC. Its oldest generator still running came online in 2026.

Capacity44 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Cartwright Solar I in context

Among the 151 solar plants in Oregon in the EIA's inventory, it is the 9th largest, about 3.1% of the state's 1.4 GW of solar capacity.

Crook County has 4 power plants of 1 MW or more with 210 MW in all; Cartwright Solar I is 21% of that and the 3rd largest of 4 solar plants there.

The average electricity customer in Crook County goes 6.6 hours a year without power, the 14th most of 32 counties in Oregon. The county's page has the full outage record.

Where it is

Cartwright Solar I (outlined) and other plants in Crook County, shaded. 44.247, -120.947.

Plant facts

Operator
Cartwright Solar I LLC
Sector
IPP Non-CHP
Grid operator
BPAT
County
Crook County, OR
EIA plant ID
69781
Where Oregon's power comes from → Oregon power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CW140 Solar Photovoltaic 44 MW 2026 –

Questions

Cartwright Solar I, answered

How much power does Cartwright Solar I produce?

Cartwright Solar I has 44 MW of capacity from one generator. No full year of generation is reported yet.

Where is Cartwright Solar I?

Cartwright Solar I is in Crook County, Oregon, at about 44.247°, -120.947°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Crook County goes 6.6 hours a year without power, the 14th most of 32 counties in Oregon. The county's page has the full outage record.

Who operates Cartwright Solar I?

It is operated by Cartwright Solar I LLC (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.

When did Cartwright Solar I open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.