Solar power plant · Crook, OR

Solar Star Oregon II

Solar Star Oregon II is a 56 MW solar power plant in Crook County, Oregon, operated by Avangrid Power LLC. Its oldest generator still running came online in 2017. In 2025 it generated 125 GWh, about what 12,000 average Oregon homes use in a year.

Capacity56 MWNameplate, September 2026
Generated125 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators1Oldest from 2017

Solar Star Oregon II in context

Among the 151 solar plants in Oregon in the EIA's inventory, it is the 7th largest, about 4.0% of the state's 1.4 GW of solar capacity.

Crook County has 4 power plants of 1 MW or more with 210 MW in all; Solar Star Oregon II is 27% of that and the 2nd largest of 4 solar plants there.

Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Crook County goes 6.6 hours a year without power, the 14th most of 32 counties in Oregon. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020182019202020212022202320242025GWh 125
0501001502019202120232025125

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Solar Star Oregon II (outlined) and other plants in Crook County, shaded. 44.184, -120.918.

Plant facts

Operator
Avangrid Power LLC
Sector
IPP Non-CHP
Grid operator
PACW
County
Crook County, OR
EIA plant ID
61048
Where Oregon's power comes from → Oregon power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 56 MW 2017 –

Questions

Solar Star Oregon II, answered

How much power does Solar Star Oregon II produce?

Solar Star Oregon II has 56 MW of capacity from one generator. In 2025 it generated 125 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does Solar Star Oregon II power?

Its 2025 output of 125 GWh equals the yearly electricity use of about 12,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Solar Star Oregon II?

Solar Star Oregon II is in Crook County, Oregon, at about 44.184°, -120.918°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Crook County goes 6.6 hours a year without power, the 14th most of 32 counties in Oregon. The county's page has the full outage record.

Who operates Solar Star Oregon II?

It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp West.

When did Solar Star Oregon II open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.