Solar power plant · Malheur, OR
Thunderegg Solar Center, LLC
Thunderegg Solar Center, LLC is a 10 MW solar power plant in Malheur County, Oregon, operated by Cypress Creek Renewables. Its oldest generator still running came online in 2016. In 2025 it generated 20 GWh, about what 2,000 average Oregon homes use in a year.
Thunderegg Solar Center, LLC in context
Among the 151 solar plants in Oregon in the EIA's inventory, it is the 13th largest, about 0.7% of the state's 1.4 GW of solar capacity.
Malheur County has 14 power plants of 1 MW or more with 110 MW in all; Thunderegg Solar Center, LLC is 9% of that and the 2nd largest of 10 solar plants there.
Its capacity factor of 23% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Malheur County goes 2.5 hours a year without power, the 29th most of 32 counties in Oregon. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Thunderegg Solar Center, LLC (outlined) and other plants in Malheur County, shaded. 43.931, -116.988.
Plant facts
- Operator
- Cypress Creek Renewables
- Sector
- IPP Non-CHP
- Grid operator
- IPCO
- County
- Malheur County, OR
- EIA plant ID
- 60334
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TSC1 | Solar Photovoltaic | 10 MW | 2016 | – |
Nearby
Other plants in Malheur County
Questions
Thunderegg Solar Center, LLC, answered
How much power does Thunderegg Solar Center, LLC produce?
Thunderegg Solar Center, LLC has 10 MW of capacity from one generator. In 2025 it generated 20 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Thunderegg Solar Center, LLC power?
Its 2025 output of 20 GWh equals the yearly electricity use of about 2,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Thunderegg Solar Center, LLC?
Thunderegg Solar Center, LLC is in Malheur County, Oregon, at about 43.931°, -116.988°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in Malheur County goes 2.5 hours a year without power, the 29th most of 32 counties in Oregon. The county's page has the full outage record.
Who operates Thunderegg Solar Center, LLC?
It is operated by Cypress Creek Renewables (EIA sector: IPP Non-CHP), and it feeds Idaho Power.
When did Thunderegg Solar Center, LLC open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.