OR Solar 2, LLC is a 10 MW solar power plant in Jackson County, Oregon, operated by OR Solar 2, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 21 GWh, about what 2,000 average Oregon homes use in a year.

Capacity10 MWNameplate, September 2026
Generated21 GWhIn 2025
Capacity factor24%Share of the most it could make, 2025
Generators1Oldest from 2020

OR Solar 2, LLC in context

Among the 151 solar plants in Oregon in the EIA's inventory, it is the 15th largest, about 0.7% of the state's 1.4 GW of solar capacity.

Jackson County has 13 power plants of 1 MW or more with 185 MW in all; OR Solar 2, LLC is 5% of that and the largest of 4 solar plants there.

Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Jackson County goes 5.4 hours a year without power, the 16th most of 32 counties in Oregon. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0510152025202020212022202320242025GWh 21
051015202520202021202220232024202521

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

OR Solar 2, LLC (outlined) and other plants in Jackson County, shaded. 42.542, -122.781.

Plant facts

Operator
OR Solar 2, LLC
Sector
IPP Non-CHP
Grid operator
PACW
County
Jackson County, OR
EIA plant ID
61200
Where Oregon's power comes from → Oregon power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ORSR2 Solar Photovoltaic 10 MW 2020 –

Nearby

Other plants in Jackson County

Lost Creek · 49 MWBiomass One LP · 40 MWProspect 2 · 32 MWGreen Springs · 17 MWEagle Point Solar · 9.9 MWMedford Operation · 8.5 MWProspect 3 · 7.2 MWProspect 1 · 3.8 MW

Questions

OR Solar 2, LLC, answered

How much power does OR Solar 2, LLC produce?

OR Solar 2, LLC has 10 MW of capacity from one generator. In 2025 it generated 21 GWh, 24% of the most it could have made running flat out all year (its capacity factor).

How many homes does OR Solar 2, LLC power?

Its 2025 output of 21 GWh equals the yearly electricity use of about 2,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is OR Solar 2, LLC?

OR Solar 2, LLC is in Jackson County, Oregon, at about 42.542°, -122.781°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Jackson County goes 5.4 hours a year without power, the 16th most of 32 counties in Oregon. The county's page has the full outage record.

Who operates OR Solar 2, LLC?

It is operated by OR Solar 2, LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp West.

When did OR Solar 2, LLC open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.