Storage power plant · Multnomah, OR

Sundial (Troutdale) BESS

Sundial (Troutdale) BESS is a 200 MW storage power plant in Multnomah County, Oregon, operated by Troutdale Grid, LLC. Its oldest generator still running came online in 2024.

Capacity200 MWNameplate, September 2026
Net energy-33.4 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2024

Sundial (Troutdale) BESS in context

Among the 4 storage plants in Oregon in the EIA's inventory, it is the 2nd largest, about 41% of the state's 492 MW of storage capacity.

Multnomah County has 6 power plants of 1 MW or more with 1.6 GW in all; Sundial (Troutdale) BESS is 13% of that and the 2nd largest of 2 storage plants there.

The average electricity customer in Multnomah County goes 8.3 hours a year without power, the 8th most of 32 counties in Oregon. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.

000111120242025GWh -33
000111120242025-33

Where it is

Sundial (Troutdale) BESS (outlined) and other plants in Multnomah County, shaded. 45.560, -122.420.

Plant facts

Operator
Troutdale Grid, LLC
Sector
IPP Non-CHP
Grid operator
PGE
County
Multnomah County, OR
EIA plant ID
67869
Where Oregon's power comes from → Oregon power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BTD Batteries 200 MW · 800 MWh 2024 –

Nearby

Other plants in Multnomah County

Bonneville · 1.2 GWSeaside BESS · 200 MWPHP 1 · 24 MWOregon Convention Center · 1.4 MWGoodling Community Solar · 1.0 MW

Questions

Sundial (Troutdale) BESS, answered

How much can Sundial (Troutdale) BESS store and deliver?

Sundial (Troutdale) BESS can deliver up to 200 MW and hold 800 MWh of energy, from one battery or storage system. Its net energy in 2025 was -33.4 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Sundial (Troutdale) BESS?

Sundial (Troutdale) BESS is in Multnomah County, Oregon, at about 45.560°, -122.420°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Multnomah County goes 8.3 hours a year without power, the 8th most of 32 counties in Oregon. The county's page has the full outage record.

Who operates Sundial (Troutdale) BESS?

It is operated by Troutdale Grid, LLC (EIA sector: IPP Non-CHP), and it feeds Portland General Electric.

When did Sundial (Troutdale) BESS open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Methodology.