Storage power plant · Multnomah, OR
Seaside BESS
Seaside BESS is a 200 MW storage power plant in Multnomah County, Oregon, operated by Portland General Electric Co. Its oldest generator still running came online in 2025.
Seaside BESS in context
Among the 4 storage plants in Oregon in the EIA's inventory, it is the largest, about 41% of the state's 492 MW of storage capacity.
Multnomah County has 6 power plants of 1 MW or more with 1.6 GW in all; Seaside BESS is 13% of that and the largest of 2 storage plants there.
The average electricity customer in Multnomah County goes 8.3 hours a year without power, the 8th most of 32 counties in Oregon. The county's page has the full outage record.
Where it is
Seaside BESS (outlined) and other plants in Multnomah County, shaded. 45.615, -122.781.
Plant facts
- Operator
- Portland General Electric Co
- Sector
- Electric Utility
- Grid operator
- PGE
- County
- Multnomah County, OR
- EIA plant ID
- 67711
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SESD1 | Batteries | 200 MW · 800 MWh | 2025 | – |
Nearby
Other plants in Multnomah County
Questions
Seaside BESS, answered
How much can Seaside BESS store and deliver?
Seaside BESS can deliver up to 200 MW and hold 800 MWh of energy, from one battery or storage system. Its net energy in 2025 was -10.6 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Seaside BESS?
Seaside BESS is in Multnomah County, Oregon, at about 45.615°, -122.781°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Multnomah County goes 8.3 hours a year without power, the 8th most of 32 counties in Oregon. The county's page has the full outage record.
Who operates Seaside BESS?
It is operated by Portland General Electric Co (EIA sector: Electric Utility), and it feeds Portland General Electric.
When did Seaside BESS open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.