Wind power plant · Gilliam, OR
Leaning Juniper Wind Power II
Leaning Juniper Wind Power II is a 199 MW wind power plant in Gilliam County, Oregon, operated by Avangrid Power LLC. Its oldest generator still running came online in 2011. In 2025 it generated 297 GWh, about what 29,000 average Oregon homes use in a year.
Leaning Juniper Wind Power II in context
Among the 50 wind plants in Oregon in the EIA's inventory, it is the 10th largest, about 4.7% of the state's 4.3 GW of wind capacity.
Gilliam County has 12 power plants of 1 MW or more with 1.9 GW in all; Leaning Juniper Wind Power II is 11% of that and the 5th largest of 10 wind plants there.
Its capacity factor of 17% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Gilliam County goes 2.6 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Leaning Juniper Wind Power II (outlined) and other plants in Gilliam County, shaded. 45.651, -120.260.
Plant facts
- Operator
- Avangrid Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- AVRN
- County
- Gilliam County, OR
- EIA plant ID
- 57333
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 199 MW | 2011 | – |
Questions
Leaning Juniper Wind Power II, answered
How much power does Leaning Juniper Wind Power II produce?
Leaning Juniper Wind Power II has 199 MW of capacity from one generator. In 2025 it generated 297 GWh, 17% of the most it could have made running flat out all year (its capacity factor).
How many homes does Leaning Juniper Wind Power II power?
Its 2025 output of 297 GWh equals the yearly electricity use of about 29,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Leaning Juniper Wind Power II?
Leaning Juniper Wind Power II is in Gilliam County, Oregon, at about 45.651°, -120.260°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Gilliam County goes 2.6 hours a year without power. The county's page has the full outage record.
Who operates Leaning Juniper Wind Power II?
It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority AVRN.
When did Leaning Juniper Wind Power II open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.