Solar power plant · Clackamas, OR

Brightwood Solar, LLC

Brightwood Solar, LLC is a 10 MW solar power plant in Clackamas County, Oregon, operated by SunStrong Management. Its oldest generator still running came online in 2021. In 2025 it generated 18 GWh, about what 1,800 average Oregon homes use in a year.

Capacity10 MWNameplate, September 2026
Generated18 GWhIn 2025
Capacity factor21%Share of the most it could make, 2025
Generators1Oldest from 2021

Brightwood Solar, LLC in context

Among the 151 solar plants in Oregon in the EIA's inventory, it is the 32nd largest, about 0.7% of the state's 1.4 GW of solar capacity.

Clackamas County has 37 power plants of 1 MW or more with 277 MW in all; Brightwood Solar, LLC is 4% of that and the 3rd largest of 29 solar plants there.

Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Clackamas County goes 18 hours a year without power, the 2nd most of 32 counties in Oregon. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05101520252022202320242025GWh 18
0510152025202220232024202518

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Brightwood Solar, LLC (outlined) and other plants in Clackamas County, shaded. 45.385, -122.084.

Plant facts

Operator
SunStrong Management
Sector
IPP Non-CHP
Grid operator
PGE
County
Clackamas County, OR
EIA plant ID
64830
Where Oregon's power comes from → Oregon power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
OS Solar Photovoltaic 10 MW 2021 –

Questions

Brightwood Solar, LLC, answered

How much power does Brightwood Solar, LLC produce?

Brightwood Solar, LLC has 10 MW of capacity from one generator. In 2025 it generated 18 GWh, 21% of the most it could have made running flat out all year (its capacity factor).

How many homes does Brightwood Solar, LLC power?

Its 2025 output of 18 GWh equals the yearly electricity use of about 1,800 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Brightwood Solar, LLC?

Brightwood Solar, LLC is in Clackamas County, Oregon, at about 45.385°, -122.084°. It is one of 37 power plants of 1 MW or more in the county. The average electricity customer in Clackamas County goes 18 hours a year without power, the 2nd most of 32 counties in Oregon. The county's page has the full outage record.

Who operates Brightwood Solar, LLC?

It is operated by SunStrong Management (EIA sector: IPP Non-CHP), and it feeds Portland General Electric.

When did Brightwood Solar, LLC open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.