Wind power plant · Umatilla, OR
FPL Energy Vansycle LLC (OR)
FPL Energy Vansycle LLC (OR) is a 123 MW wind power plant in Umatilla County, Oregon, operated by FPL Energy Vansycle LLC. Its oldest generator still running came online in 2001. In 2025 it generated 225 GWh, about what 22,000 average Oregon homes use in a year.
FPL Energy Vansycle LLC (OR) in context
Among the 50 wind plants in Oregon in the EIA's inventory, it is the 11th largest, about 2.9% of the state's 4.3 GW of wind capacity.
Umatilla County has 17 power plants of 1 MW or more with 2.7 GW in all; FPL Energy Vansycle LLC (OR) is 5% of that and the largest of 11 wind plants there.
Its capacity factor of 21% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Umatilla County goes 3.9 hours a year without power, the 26th most of 32 counties in Oregon. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
FPL Energy Vansycle LLC (OR) (outlined) and other plants in Umatilla County, shaded. 46.013, -118.816.
Plant facts
- Operator
- FPL Energy Vansycle LLC
- Sector
- IPP Non-CHP
- Grid operator
- BPAT
- County
- Umatilla County, OR
- EIA plant ID
- 55989
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| V-47 | Onshore Wind Turbine | 123 MW | 2001 | – |
Questions
FPL Energy Vansycle LLC (OR), answered
How much power does FPL Energy Vansycle LLC (OR) produce?
FPL Energy Vansycle LLC (OR) has 123 MW of capacity from one generator. In 2025 it generated 225 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does FPL Energy Vansycle LLC (OR) power?
Its 2025 output of 225 GWh equals the yearly electricity use of about 22,000 average Oregon homes (866 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is FPL Energy Vansycle LLC (OR)?
FPL Energy Vansycle LLC (OR) is in Umatilla County, Oregon, at about 46.013°, -118.816°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Umatilla County goes 3.9 hours a year without power, the 26th most of 32 counties in Oregon. The county's page has the full outage record.
Who operates FPL Energy Vansycle LLC (OR)?
It is operated by FPL Energy Vansycle LLC (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.
When did FPL Energy Vansycle LLC (OR) open?
Its oldest generator still running came online in 2001.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oregon home's 866 kWh a month in 2025. Methodology.