AI data center · Hillsboro, Oregon

Meta-QTS Hillsboro 2

Meta's AI campus in Washington County. It draws about 180 MW today and is planned to reach 243 MW by November 2024.

Power now180 MWAs of Apr 17, 2026
Planned peak243 MWNovember 2024
Compute124kH100-equivalent chips now
Capital cost$6.8BSo far, 2025 dollars

Latest look · Apr 17, 2026

What the satellite shows

All four buildings are operational.

Build-out

Power, month by month

0 MW100 MW200 MW300 MW20222023202420252026
Power drawn by Meta-QTS Hillsboro 2, from Epoch AI's dated observations.
0 MW100 MW200 MW300 MW20222023202420252026
Power drawn by Meta-QTS Hillsboro 2, from Epoch AI's dated observations.

Who

Owners, users and builders

Owner
Meta (likely)
Used by
Meta (likely)
Energy companies
Portland General Electric, Avangrid
Chips
H100
Address
4755 NE Huffman St, Hillsboro, OR 97124
County
Washington County

Where

On the map of Oregon

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
River Road Gen Plant● Natural gas248 MW11.9 mi
Seaside BESS● Storage200 MW8.3 mi
Constable BESS● Storage75 MW0.6 mi
MilfordSolar OR● Solar3 MW5.8 mi
O'Neill Creek Solar● Solar2 MW11.2 mi
Durham AWTF● Biomass2 MW13.5 mi
Oregon Convention Center● Solar1 MW13.2 mi
Goodling Community Solar● Solar1 MW14.6 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Apr 17, 2026All four buildings are operational.243 MW
Apr 14, 2025All four buildings are operational243 MW
Nov 8, 2024We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to the level seen during normal operation at other data center campuses. Finally, it is more than 12 months after cooling has been installed or in the final stages of install for the remaining three buildings.243 MW
Aug 2, 2023Satellite imagery shows Building 2 and 3 cooling nearing completion and Building 4 cooling install continues. We believe Building 1 is operational now due to the lack of construction equipment on or immediately around the building.61 MW
Apr 29, 2023Satellite imagery shows Building 3 and 4 cooling start to go on.–
Apr 1, 2021First signs of site land clearing appear on satellite imagery.–

How much power does Meta-QTS Hillsboro 2 use?

About 180 MW as of Apr 17, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 243 MW in its build plans by November 2024. Running all year, 180 MW would use about 1.6 TWh.

Who owns Meta-QTS Hillsboro 2?

Meta (likely); used by Meta (likely). Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Meta-QTS Hillsboro 2?

In Washington County, the average customer is without power about 4.0 hours in a typical year in this site's outage record, with 3 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Meta-QTS Hillsboro 2?

8 plants within 15 miles total about 532 MW; the largest is River Road Gen Plant (248 MW, natural gas), 11.9 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus

Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.