Data centers · South Dakota

Data centers in South Dakota

6 operating data center sites, 3 projects planned or under construction.

Operating sites60 whole campuses
AI campuses0None tracked by Epoch AI
In the pipeline30 under construction, 3 planned
Home price13.3¢/kWh+15% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Leola Data Center Leola Data Center LLC McPherson Planned 50 MW 2025
Sequitor Edge Rapid City Data Center Sequitor Edge Pennington Planned 15 MW 2027
Sequitor Edge Brookings Research Park Data Center Sequitor Edge Brookings Planned 2 MW 2027
Applied Digital SD Campus Applied Digital Deuel Cancelled 430 MW –

Local pushback

Bans and moratoriums

2 recorded as enacted, 1 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Lincoln County · Lincoln County Defeated Aug 25, 2026 Term not documented
Minnehaha County · Minnehaha County Under Review Aug 24, 2026 Term not documented
Yankton County · Yankton County Enacted Jul 21, 2026 to Jan 21, 2027
Aberdeen · Brown Local Enacted Jul 20, 2026 to Nov 18, 2026

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Minnehaha County65.6 h

Every named site

The list

6 of 6 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
ADP South Dakota – Minnehaha Building 5.5
TierPoint Sioux Falls West Data Center – Minnehaha Building 1.3
Tierpoint Sioux Falls - East Data Center TierPoint Minnehaha Civic Returns 0.4
Hsbc Sioux Falls Data Center – Minnehaha EPA record –
Usgs - Eros Data Center – Minnehaha EPA record –
USGS EROS Data Center – Minnehaha Overture place –

How many data centers are in South Dakota?

6 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 44th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in South Dakota?

0 under construction and 3 planned or announced in the Civic Returns and Server Country databases; the 3 that publish a size add up to about 67 MW. 1 project has been cancelled.

Which South Dakota county has the most data centers?

Minnehaha County, with 6 operating sites.

Who operates data centers in South Dakota?

Among sites that name an operator: TierPoint (1).

What do South Dakota households pay for electricity?

13.3¢ per kWh on average in 2025 (US: 17.2¢), up 15% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.