Data centers · South Dakota
Data centers in South Dakota
6 operating data center sites, 3 projects planned or under construction.
The map
Every mapped site
The pipeline
Projects on the way
From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.
| Project | Developer | County | Status | Announced size | Year |
|---|---|---|---|---|---|
| Leola Data Center | Leola Data Center LLC | McPherson | Planned | 50 MW | 2025 |
| Sequitor Edge Rapid City Data Center | Sequitor Edge | Pennington | Planned | 15 MW | 2027 |
| Sequitor Edge Brookings Research Park Data Center | Sequitor Edge | Brookings | Planned | 2 MW | 2027 |
| Applied Digital SD Campus | Applied Digital | Deuel | Cancelled | 430 MW | – |
Local pushback
Bans and moratoriums
2 recorded as enacted, 1 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.
| Where | Level | Status | Date | Runs |
|---|---|---|---|---|
| Lincoln County · Lincoln | County | Defeated | Aug 25, 2026 | Term not documented |
| Minnehaha County · Minnehaha | County | Under Review | Aug 24, 2026 | Term not documented |
| Yankton County · Yankton | County | Enacted | Jul 21, 2026 | to Jan 21, 2027 |
| Aberdeen · Brown | Local | Enacted | Jul 20, 2026 | to Nov 18, 2026 |
By county
Where the data centers cluster
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Minnehaha County | 6 | 5.6 h |
Every named site
The list
6 of 6 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).
| Site | Operator | County | Source | Acres |
|---|---|---|---|---|
| ADP South Dakota | – | Minnehaha | Building | 5.5 |
| TierPoint Sioux Falls West Data Center | – | Minnehaha | Building | 1.3 |
| Tierpoint Sioux Falls - East Data Center | TierPoint | Minnehaha | Civic Returns | 0.4 |
| Hsbc Sioux Falls Data Center | – | Minnehaha | EPA record | – |
| Usgs - Eros Data Center | – | Minnehaha | EPA record | – |
| USGS EROS Data Center | – | Minnehaha | Overture place | – |
How many data centers are in South Dakota?
6 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 44th most of any state. The map covers most large sites, not every server room, so the true number is higher.
How many data centers are being built in South Dakota?
0 under construction and 3 planned or announced in the Civic Returns and Server Country databases; the 3 that publish a size add up to about 67 MW. 1 project has been cancelled.
Which South Dakota county has the most data centers?
Minnehaha County, with 6 operating sites.
Who operates data centers in South Dakota?
Among sites that name an operator: TierPoint (1).
What do South Dakota households pay for electricity?
13.3¢ per kWh on average in 2025 (US: 17.2¢), up 15% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.
Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.