AI data center · Ridgeland, Mississippi

Amazon Ridgeland

Amazon's AI campus in Hinds County. It draws about 228 MW today and is planned to reach 1.01 GW by September 2028.

Power now228 MWAs of May 15, 2026
Planned peak1.01 GWSeptember 2028
Compute171kH100-equivalent chips now
Capital cost$8.6BSo far, 2025 dollars

Latest look · May 15, 2026

What the satellite shows

Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling equipment.

Build-out

Power, month by month

0 MW200 MW400 MW600 MW800 MW1 GW1.2 GW2025202620272028Today
Power drawn by Amazon Ridgeland, from Epoch AI's dated observations and (hatched) its projections.
0 MW200 MW400 MW600 MW800 MW1 GW1.2 GW2025202620272028Today
Power drawn by Amazon Ridgeland, from Epoch AI's dated observations and (hatched) its projections.

Who

Owners, users and builders

Owner
Amazon
Used by
Anthropic (speculative)
Project
Project Rainier (speculative)
Energy companies
Entergy
Chips
Trainium2
Address
1626 County Line Road Ridgeland, Mississippi
County
Hinds County

Where

On the map of Mississippi

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Hinds Energy Facility● Natural gas600 MW6 mi
Ragsdale Solar LLC● Solar100 MW12.3 mi
Mississippi Baptist Medical Center● Natural gas4 MW6.9 mi
Lineage MS● Solar1 MW10.2 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
May 15, 2026Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling equipment.273 MW
Oct 4, 2025Roof complete on Buildings 3–
Feb 24, 2024Land clearing begins–

Plus 2 projected steps to September 2028, from Epoch AI's reading of the build plans.

How much power does Amazon Ridgeland use?

About 228 MW as of May 15, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 1.01 GW in its build plans by September 2028. Running all year, 228 MW would use about 2.0 TWh.

Who owns Amazon Ridgeland?

Amazon; used by Anthropic (speculative). Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Amazon Ridgeland?

In Hinds County, the average customer is without power about 16 hours in a typical year in this site's outage record, with 8 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Amazon Ridgeland?

4 plants within 15 miles total about 706 MW; the largest is Hinds Energy Facility (600 MW, natural gas), 6 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus

Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.