AI data center · Canton, Mississippi

Amazon Madison Mega Site

Amazon's AI campus in Madison County. It draws about 284 MW today and is planned to reach 819 MW by March 2028.

Power now284 MWAs of Jun 4, 2026
Planned peak819 MWMarch 2028
Compute214kH100-equivalent chips now
Capital cost$11BSo far, 2025 dollars

Latest look · Jun 4, 2026

What the satellite shows

Buildings 6 and 7 roof completed. Building 8 roof nearly completed. Building 9 roof half way up. No new operational buildings.

Build-out

Power, month by month

0 MW200 MW400 MW600 MW800 MW1 GW20242025202620272028Today
Power drawn by Amazon Madison Mega Site, from Epoch AI's dated observations and (hatched) its projections.
0 MW200 MW400 MW600 MW800 MW1 GW20242025202620272028Today
Power drawn by Amazon Madison Mega Site, from Epoch AI's dated observations and (hatched) its projections.

Who

Owners, users and builders

Owner
Amazon
Used by
Anthropic (speculative)
Project
Project Rainier (speculative)
Chips
Trainium2
Address
Amazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County
County
Madison County

Where

On the map of Mississippi

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed at the centre of the county its address names; the exact site is not mapped here.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Ragsdale Solar LLC● Solar100 MW5.8 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Jun 4, 2026Buildings 6 and 7 roof completed. Building 8 roof nearly completed. Building 9 roof half way up. No new operational buildings.341 MW
Oct 4, 2025Confirmation that five buildings are fully equipped with cooling and backup generators.341 MW
Jun 23, 2025Buildings 1-5 are operational, based on roofs being completed 5 months ago and generators being installed by 2025-04-10.341 MW
Mar 11, 2025Generators and chillers still being installed on buildings 1-5.–
Oct 2, 2023Land clearing begins–

Plus 2 projected steps to March 2028, from Epoch AI's reading of the build plans.

How much power does Amazon Madison Mega Site use?

About 284 MW as of Jun 4, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 819 MW in its build plans by March 2028. Running all year, 284 MW would use about 2.5 TWh.

Who owns Amazon Madison Mega Site?

Amazon; used by Anthropic (speculative). Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Amazon Madison Mega Site?

In Madison County, the average customer is without power about 17 hours in a typical year in this site's outage record, with 32 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Amazon Madison Mega Site?

One plant is within 15 miles: Ragsdale Solar LLC (100 MW, solar), 5.8 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus

Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.