AI data center · Canton, Mississippi
Amazon Madison Mega Site
Amazon's AI campus in Madison County. It draws about 284 MW today and is planned to reach 819 MW by March 2028.
Latest look · Jun 4, 2026
What the satellite shows
Buildings 6 and 7 roof completed. Building 8 roof nearly completed. Building 9 roof half way up. No new operational buildings.
Build-out
Power, month by month
Who
Owners, users and builders
- Owner
- Amazon
- Used by
- Anthropic (speculative)
- Project
- Project Rainier (speculative)
- Chips
- Trainium2
- Address
- Amazon Data Services Inc, Madison Mega Site Nissan Parkway and Highway 22 Canton, Mississippi Madison County
- County
- Madison County
Where
On the map of Mississippi
Placed at the centre of the county its address names; the exact site is not mapped here.
Nearby
Power plants within 15 miles
| Plant | Source | Capacity | Distance |
|---|---|---|---|
| Ragsdale Solar LLC | ● Solar | 100 MW | 5.8 mi |
Timeline
Every observation
| Date | What Epoch AI saw | Power |
|---|---|---|
| Jun 4, 2026 | Buildings 6 and 7 roof completed. Building 8 roof nearly completed. Building 9 roof half way up. No new operational buildings. | 341 MW |
| Oct 4, 2025 | Confirmation that five buildings are fully equipped with cooling and backup generators. | 341 MW |
| Jun 23, 2025 | Buildings 1-5 are operational, based on roofs being completed 5 months ago and generators being installed by 2025-04-10. | 341 MW |
| Mar 11, 2025 | Generators and chillers still being installed on buildings 1-5. | – |
| Oct 2, 2023 | Land clearing begins | – |
Plus 2 projected steps to March 2028, from Epoch AI's reading of the build plans.
How much power does Amazon Madison Mega Site use?
About 284 MW as of Jun 4, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 819 MW in its build plans by March 2028. Running all year, 284 MW would use about 2.5 TWh.
Who owns Amazon Madison Mega Site?
Amazon; used by Anthropic (speculative). Labels in brackets are Epoch AI's confidence where it is not "confident".
How reliable is the power around Amazon Madison Mega Site?
In Madison County, the average customer is without power about 17 hours in a typical year in this site's outage record, with 32 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.
What power plants are near Amazon Madison Mega Site?
One plant is within 15 miles: Ragsdale Solar LLC (100 MW, solar), 5.8 miles away. Nearness does not mean it supplies the campus.
Epoch AI's sources for this campus
- Air Construction Permit
- Backup diesel generator referenced in the permit
- New York Times article on Project Rainier
- SemiAnalysis article with imagery of Canton they have labeled as being an Amazon-Anthropic collaboration
Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.