Data centers · Tennessee

Data centers in Tennessee

39 operating data center sites, 9 projects planned or under construction and 3 AI campuses planned to draw 2.6 GW.

Operating sites3910 whole campuses
AI campuses31.4 GW drawn now
In the pipeline94 under construction, 5 planned
Home price13.2¢/kWh+23% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Tennessee's AI data centers

CampusOwnerWhereNowPlanned
Colossus 2SpaceXAIShelby County946 MW2.1 GW
Colossus 1SpaceXAIShelby County340 MW442 MW
Meta GallatinMetaSumner County87 MW114 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Evoque-Archer Nashville Campus Evoque Data Center Solutions Sumner Under construction 100 MW 2020
Nashville I RadiusDC Davidson Under construction 12 MW 2026
5C MEM01 5C Shelby Under construction – –
Bitdeer Knoxville (AI cloud conversion) Bitdeer Knox Under construction – –
xAI Colossus xAI Shelby Planned 2.0 GW –
Fisk Quantum Leap Innovation & Technology Center Fisk University Davidson Planned 30 MW –
Hixson Data Center Hixson Data Center Warren Planned 25 MW 2028
Lawrenceburg Flatwoods Road Data Center – Lawrence Planned 5 MW 2027
Jailhouse Studios AI Data Center Urban Story Ventures Hamilton Planned – 2027
CleanSpark New Salem Bitcoin Mine CleanSpark Washington Cancelled 25 MW –

Local pushback

Bans and moratoriums

25 recorded as enacted, 2 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Memphis · Shelby Local Proposed Aug 18, 2026 Term not documented
Carter County · Carter Local Enacted Aug 17, 2026 to Aug 17, 2027
Crossville · Cumberland Local Enacted Aug 12, 2026 to Aug 12, 2028
Nashville · Davidson Local Enacted Jul 21, 2026 to Dec 1, 2026
Knoxville · Knox Local Enacted Jul 8, 2026 to Jul 7, 2027
Knox County · Knox Local Enacted Jun 22, 2026 to Jun 22, 2027
Anderson County · Anderson Local Enacted Jun 15, 2026 to Jun 15, 2028
McMinnville · Warren Local Enacted Jun 3, 2026 to Dec 3, 2027
Johnson City · Washington Local Enacted May 22, 2026 to Dec 3, 2026
Washington County · Washington County Enacted Mar 24, 2026 to Jun 30, 2027
Jonesborough · Washington Local Enacted Jan 1, 2026 No end date by design — a permanent ban or standing statute
Maury County · Maury County Enacted Jan 1, 2026 to Jul 19, 2027
Spring City · Rhea Local Enacted Jan 1, 2026 to Jul 30, 2028
Hamblen County · Hamblen County Enacted Jan 1, 2026 to Jul 7, 2027
Loudon County · Loudon County Enacted Jan 1, 2026 to Dec 30, 2026

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Shelby County1015 h
Williamson County61.4 h
Davidson County67.1 h
Sumner County34.5 h
Hamilton County31.8 h
Montgomery County23.5 h
Rutherford County11.1 h
Henry County112 h
Grainger County16.3 h
Roane County13.2 h

Every named site

The list

36 of 39 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Google Montgomery Data Center Google Montgomery Campus, 4 buildings 608
Gallatin Data Center Meta Sumner Campus, 3 buildings 389
Colossus 2 xAI Shelby Civic Returns 23
xAI Macrohard Colossus 2 xAI Shelby Building 22
Flexential Brentwood Data Center Flexential Williamson Campus 22
xAI Colossus xAI Shelby Building 18
Tennessee Processing Center LLC BNYM Davidson Campus 13
HCA Information Technology & Services Data Center – Davidson Campus 12
Evoque TN campus (including expansion) Centersquare Sumner Civic Returns 11
Verizon Wireless – Davidson Campus 6.6
TierPoint – Williamson Campus 6.5
Tennessee South Data Center State of Tennessee Rutherford Campus 5.5
Newrays Two LLC Mining – Henry Campus 2.0
Flexential Nashville - Franklin Flexential Williamson Building 1.7
Flexential Nashville - Cool Springs Flexential Williamson Building 1.6
EdgeConneX NAS01 EdgeConneX Davidson Civic Returns 1.0
EdgeConneX MEM01 EdgeConneX Shelby Civic Returns 0.4
DC Blox Chattanooga – Hamilton Building 0.2
Memphis Data Center MEM1 DataBank Shelby Civic Returns 0.2
Frontier (supercomputer) Oak Ridge National Laboratory Roane Point –
CleanSpark Jellico CleanSpark Campbell Operator's own list –
CleanSpark Decatur CleanSpark Meigs Operator's own list –
CleanSpark Tazewell CleanSpark Claiborne Operator's own list –
Cogent Chattanooga Edge Data Center Cogent Communications Hamilton Operator's own list –
Cogent Memphis Edge Data Center Cogent Communications Shelby Operator's own list –

How many data centers are in Tennessee?

39 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 22nd most of any state. 10 are mapped as whole campuses. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Tennessee?

4 under construction and 5 planned or announced in the Civic Returns and Server Country databases; the 6 that publish a size add up to about 2.2 GW, besides 3 AI campuses tracked by Epoch AI. 1 project has been cancelled.

Which Tennessee county has the most data centers?

Shelby County, with 10 operating sites, then Williamson County (6) and Davidson County (6).

Who operates data centers in Tennessee?

Among sites that name an operator: xAI (3), Flexential (3), CleanSpark (3), Cogent Communications (3), EdgeConneX (2).

What AI data centers are in Tennessee?

Colossus 2 in Memphis (946 MW now, 2.1 GW planned); Colossus 1 in Memphis (340 MW now, 442 MW planned); Meta Gallatin in Gallatin (87 MW now, 114 MW planned), by Epoch AI's estimates.

What do Tennessee households pay for electricity?

13.2¢ per kWh on average in 2025 (US: 17.2¢), up 23% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.