AI data center · Lordstown, Ohio
OpenAI Stargate Lordstown
Softbank's AI campus in Trumbull County. It is not drawing power yet and is planned to reach 300 MW by March 2027.
Latest look · Jul 30, 2026
What the satellite shows
Active construction visible on and around the datacenter, with the roofing mostly in place. This is based on satellite imagery. No buildings operational yet.
Build-out
Power, month by month
Who
Owners, users and builders
- Owner
- Softbank
- Used by
- OpenAI
- Project
- Stargate
- Chips
- Rubin
- Address
- 2300 Hallock Young Rd, Warren, OH 44481
- County
- Trumbull County
Where
On the map of Ohio
Placed by its street address.
Nearby
Power plants within 15 miles
| Plant | Source | Capacity | Distance |
|---|---|---|---|
| Trumbull Energy Center | ● Natural gas | 977 MW | 1.6 mi |
| Middletown- Ohio | ● Natural gas | 962 MW | 1.7 mi |
| Niles Power Plant | ● Oil | 27 MW | 7.2 mi |
| Clevelandcliffs Warren | ● Other | 13 MW | 5.8 mi |
| Niles RTO BTM | ● Oil | 11 MW | 7 mi |
| KSU Trumbull | ● Solar | 1 MW | 9.6 mi |
Timeline
Every observation
| Date | What Epoch AI saw | Power |
|---|---|---|
| Jul 30, 2026 | Active construction visible on and around the datacenter, with the roofing mostly in place. This is based on satellite imagery. No buildings operational yet. | – |
| Feb 27, 2026 | Still no visible construction, although construction within preexisting facilities | – |
| Oct 12, 2025 | Land clearing begins in the front of the site (the side facing the Ohio Turnpike), clearing away a parking lot and solar array | – |
Plus 1 projected step to March 2027, from Epoch AI's reading of the build plans.
How much power does OpenAI Stargate Lordstown use?
It is not drawing power yet in Epoch AI's timeline; it is planned to reach about 300 MW by March 2027.
Who owns OpenAI Stargate Lordstown?
Softbank; used by OpenAI. Labels in brackets are Epoch AI's confidence where it is not "confident".
How reliable is the power around OpenAI Stargate Lordstown?
In Trumbull County, the average customer is without power about 8.4 hours in a typical year in this site's outage record, with 18 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.
What power plants are near OpenAI Stargate Lordstown?
6 plants within 15 miles total about 1.99 GW; the largest is Trumbull Energy Center (977 MW, natural gas), 1.6 miles away. Nearness does not mean it supplies the campus.
Epoch AI's sources for this campus
- Announcement of 5 new Stargate sites mentioning Lordstown
- Water Quality Permitting stating that “manufacturing and assembly” is the main purpose of the construction
- Stormwater Permitting
Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.