AI data center · Lancaster, Ohio
Google Lancaster
Google's AI campus in Fairfield County. It draws about 137 MW today and is planned to reach 164 MW by October 2025.
Latest look · Mar 12, 2026
What the satellite shows
At this point, Building 1 and 2 have since already been operational. Additionally, there is visible steam showing clear evidence of operational for both before this date.
Build-out
Power, month by month
Who
Owners, users and builders
- Owner
- Chips
- TPU v5e, TPU v6e
- Address
- 105 Whiley Rd, Lancaster, OH 43130
- County
- Fairfield County
Where
On the map of Ohio
Placed by its street address.
Timeline
Every observation
| Date | What Epoch AI saw | Power |
|---|---|---|
| Mar 12, 2026 | At this point, Building 1 and 2 have since already been operational. Additionally, there is visible steam showing clear evidence of operational for both before this date. | 164 MW |
| Oct 31, 2025 | Building 2 operational. This is supported by the state of Building 2 a month prior, which is entirely complete outside of some equipment that was removed later on. | 164 MW |
| Sep 11, 2025 | Building 2 is close to completion. Structurally it is already complete, but there is still some equipment strewn around the building that suggests commissioning is ongoing. | 82 MW |
| Jan 1, 2024 | Building 1 operational. This is estimated based on construction progress in October 2023. This also corresponds to a 2023 article where a Google spokesperson says that the "the Lancaster data center will open later this year". | 82 MW |
| Oct 1, 2021 | Land clearing in progress for the site | – |
How much power does Google Lancaster use?
About 137 MW as of Mar 12, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 164 MW in its build plans by October 2025. Running all year, 137 MW would use about 1.2 TWh.
Who owns Google Lancaster?
Google. Labels in brackets are Epoch AI's confidence where it is not "confident".
How reliable is the power around Google Lancaster?
In Fairfield County, the average customer is without power about 5.1 hours in a typical year in this site's outage record, with 17 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.
Epoch AI's sources for this campus
Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.