AI data center · Bowling Green, Ohio

Meta Bowling Green

Meta's AI campus in Wood County. It is not drawing power yet and is planned to reach 570 MW by January 2028.

Power now–As of Jul 30, 2026
Planned peak570 MWJanuary 2028
Compute–H100-equivalent chips now
Capital cost–So far, 2025 dollars

Latest look · Jul 30, 2026

What the satellite shows

Roofs of Buildings 1 and 2 are more than halfway complete. All chillers for both buildings are visible. Construction on Buildings 3 and 4 has begun, with outlines laid. Construction on the Apollo Power Generation Project (a BTM power plant built just to the east of the data center) is in progress, with foundations poured and generation equipment being set in place.

Build-out

Power, month by month

0 MW200 MW400 MW600 MW800 MW2025202620272028Today
Power drawn by Meta Bowling Green, from Epoch AI's dated observations and (hatched) its projections.
0 MW200 MW400 MW600 MW800 MW2025202620272028Today
Power drawn by Meta Bowling Green, from Epoch AI's dated observations and (hatched) its projections.

Who

Owners, users and builders

Owner
Meta
Used by
Meta
Energy companies
Williams
Chips
B300, Rubin
Address
12356 Middleton Pike, Bowling Green, OH 43402
County
Wood County

Where

On the map of Ohio

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Troy Energy LLC● Natural gas796 MW9.2 mi
Bowling Green Generating Station● Natural gas50 MW4.2 mi
Bowling Green Peaking● Natural gas32 MW4.8 mi
DG AMP Solar Bowling Green● Solar20 MW5.1 mi
Bowling Green Energy Storage Project● Storage12 MW5.4 mi
Toledo Ref Power Recovery Train● Oil6 MW13.8 mi
Genoa Diesel Generating Station● Oil6 MW14.7 mi
Martin Marietta Wind Project● Wind5 MW13.9 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Jul 30, 2026Roofs of Buildings 1 and 2 are more than halfway complete. All chillers for both buildings are visible. Construction on Buildings 3 and 4 has begun, with outlines laid. Construction on the Apollo Power Generation Project (a BTM power plant built just to the east of the data center) is in progress, with foundations poured and generation equipment being set in place.–
Feb 14, 2026Buildings 1 and 2 under construction. Building 1's chillers are almost all in place, while only half of Building 2's are. Optimus substation, which is the substation on site, and the expansion of Dowling Substation, an existing substation to the northeast of the data center, appear complete.–
Nov 1, 2024Land clearing begins.–

Plus 3 projected steps to January 2028, from Epoch AI's reading of the build plans.

How much power does Meta Bowling Green use?

It is not drawing power yet in Epoch AI's timeline; it is planned to reach about 570 MW by January 2028.

Who owns Meta Bowling Green?

Meta; used by Meta. Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Meta Bowling Green?

In Wood County, the average customer is without power about 1.4 hours in a typical year in this site's outage record, with 1 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Meta Bowling Green?

8 plants within 15 miles total about 942 MW; the largest is Troy Energy LLC (796 MW, natural gas), 9.2 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus