Data centers · Ohio

Data centers in Ohio

130 operating data center sites, 38 projects planned or under construction and 7 AI campuses planned to draw 3.6 GW. Ohio ranks 5th of 51 by mapped sites.

Operating sites1306 whole campuses
AI campuses71.5 GW drawn now
In the pipeline3816 under construction, 22 planned
Home price16.9¢/kWh+35% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Ohio's AI data centers

CampusOwnerWhereNowPlanned
Meta PrometheusMetaFranklin County471 MW1.3 GW
Google New AlbanyGoogleLicking County333 MW400 MW
Google ColumbusGoogleFranklin County303 MW464 MW
AWS New AlbanyAmazonLicking County213 MW405 MW
Google LancasterGoogleFairfield County137 MW164 MW
Meta Bowling GreenMetaWood County–570 MW
OpenAI Stargate LordstownSoftbankTrumbull County–300 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Prologis Project Mila Trenton Data Center Campus Prologis Butler Under construction 250 MW 2029
Bitdeer Massillon Data Center Campus Bitdeer Stark Under construction 221 MW 2026
Microsoft Licking County Campuses Microsoft Franklin Under construction 143 MW 2027
EdgeConneX New Albany Campus EdgeConneX Licking Under construction 120 MW 2026
Aligned Data Centers: NEO-01 Aligned Erie Under construction 96 MW 2026
Cologix COL7 Cologix Licking Under construction 36 MW –
COL5 Cologix Delaware Under construction 25 MW 2026
5C Data Centers CMH01 5C Data Centers Clark Under construction – 2027
Aligned Data Centers: CMH-02 Conesville Industrial Park Aligned Coshocton Under construction – 2026
EdgeConneX CMH EdgeConneX Franklin Under construction – –
Google Project BOSC Lima Data Center Google Allen Under construction – 2030
MARA Hopedale Ohio MARA Harrison Under construction – –
Microsoft datacenters - Heath Microsoft Licking Under construction – –
Microsoft datacenters - Hebron Microsoft Licking Under construction – –
QTS New Albany 1 QTS Licking Under construction – –
QTS New Albany 2 QTS Licking Under construction – –
EdgeConneX Ashville Data Center Campus EdgeConneX Pickaway Planned 1.8 GW 2028
Vantage Millersport Campus Vantage Data Centers Fairfield Planned 800 MW 2027
Bitdeer Shalersville Data Center Campus Bitdeer Portage Planned 750 MW –
Bitdeer Clarington Hannibal Industrial Park Data Center Bitdeer Monroe Planned 570 MW –

Local pushback

Bans and moratoriums

55 recorded as enacted, 1 proposed or under review, 7 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Delphos · Van Wert Local Enacted Oct 5, 2026 A stated duration, but the end date isn't recorded here
Defiance · Defiance Local Enacted Sep 1, 2026 A stated duration, but the end date isn't recorded here
Plain City · Union Local Proposed Aug 10, 2026 Term not documented
Athens · Athens Local Enacted Aug 4, 2026 to Aug 4, 2027
Vienna Township (Trumbull Co.) · Trumbull Local Expired Aug 1, 2026 to Oct 16, 2026
Cleveland · Cuyahoga Local Expired Jul 15, 2026 to Oct 16, 2026
Springfield · Clark Local Enacted Jul 14, 2026 to Jan 14, 2027
Girard · Trumbull Local Enacted Jul 13, 2026 to Jul 13, 2027
Ohio (ballot measure) · Franklin State Rejected Jul 1, 2026 Term not documented
St. Marys · Auglaize Local Enacted Jun 22, 2026 to Jun 22, 2027
Avon Lake · Lorain Local Enacted Jun 22, 2026 to Jun 22, 2027
Montgomery Township (Ashland Co.) · Ashland Local Enacted Jun 18, 2026 to Jul 1, 2028
Butler County · Butler Local Enacted Jun 16, 2026 to Dec 16, 2026
Berea · Cuyahoga Local Enacted Jun 15, 2026 to Jun 15, 2027
Howland Township · Trumbull Local Enacted Jun 10, 2026 to Dec 10, 2026

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Franklin County416.5 h
Licking County353.5 h
Cuyahoga County98.0 h
Union County91.8 h
Hamilton County93.8 h
Delaware County35.9 h
Warren County33.4 h
Montgomery County33.8 h
Butler County23.5 h
Fairfield County25.1 h

Every named site

The list

122 of 130 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Google Lockbourne, OH Google Franklin Campus 262
Amazon AWS: Hilliard Data Center Amazon Web Services Franklin Campus, 5 buildings 59
CyrusOne Cincinnati-Hamilton CIN4 CyrusOne Butler Campus 35
T5@Cleveland T5 Data Centers Cuyahoga Campus 22
NAO 1/NAO 2 Meta Licking Building 15
Aligned Data Centers Aligned Erie Campus 14
NAO 5/NAO 6 Meta Licking Building 14
STACK New Albany – Franklin Campus 13
NAO 3 Meta Licking Building 8.4
LCO 1 Meta Licking Building 8.3
LCO 2 Meta Licking Building 6.9
Google Google Fairfield Building 6.7
Google Google Fairfield Building 6.6
Google NBY-3 Google Licking Building 6.6
Google NBY-6 Google Franklin Building 6.6
Google NBY-5 Google Franklin Building 6.6
Google NBY-4 Google Franklin Building 6.5
Google NBY-7 Google Licking Building 6.2
Vantage Building 1 Vantage Licking Building 5.6
Vantage Building 2 Vantage Licking Building 5.4
Amazon Web Services Amazon Web Services Union Building 5.3
QTS NAL1 DC2 QTS Licking Building 5.2
QTS NAL1 DC1 QTS Licking Building 5.1
Vantage Building 3 Vantage Licking Building 5.1
Amazon Web Services Amazon Web Services Franklin Building 5.0

How many data centers are in Ohio?

130 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 5th most of any state. 6 are mapped as whole campuses. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Ohio?

16 under construction and 22 planned or announced in the Civic Returns and Server Country databases; the 19 that publish a size add up to about 6.8 GW, besides 7 AI campuses tracked by Epoch AI. 2 projects have been cancelled.

Which Ohio county has the most data centers?

Franklin County, with 41 operating sites, then Licking County (35) and Cuyahoga County (9).

Who operates data centers in Ohio?

Among sites that name an operator: Amazon Web Services (35), Google (10), Cogent Communications (8), Meta (6), CyrusOne (5).

What AI data centers are in Ohio?

Meta Prometheus in New Albany (471 MW now, 1.3 GW planned); Google New Albany in New Albany (333 MW now, 400 MW planned); Google Columbus in Columbus (303 MW now, 464 MW planned); AWS New Albany in New Albany (213 MW now, 405 MW planned); Google Lancaster in Lancaster (137 MW now, 164 MW planned); Meta Bowling Green in Bowling Green (not yet drawing power, 570 MW planned); OpenAI Stargate Lordstown in Lordstown (not yet drawing power, 300 MW planned), by Epoch AI's estimates.

What do Ohio households pay for electricity?

16.9¢ per kWh on average in 2025 (US: 17.2¢), up 35% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.