AI data center · Atlanta, Georgia

xAI QTS Atlanta

SpaceXAI's AI campus in Fulton County. It draws about 17 MW today and is planned to reach 24 MW by February 2025.

Power now17 MWAs of Jul 10, 2026
Planned peak24 MWFebruary 2025
Compute11kH100-equivalent chips now
Capital cost$0.7BSo far, 2025 dollars

Latest look · Jul 10, 2026

What the satellite shows

No significant change to the building since the August 2025 image.

Build-out

Power, month by month

0 MW10 MW20 MW30 MW202420252026
Power drawn by xAI QTS Atlanta, from Epoch AI's dated observations.
0 MW10 MW20 MW30 MW202420252026
Power drawn by xAI QTS Atlanta, from Epoch AI's dated observations.

Who

Owners, users and builders

Owner
SpaceXAI
Used by
SpaceXAI
Chips
H100, A100
Address
1025 Jefferson Street NW, Atlanta, GA 30318
County
Fulton County

Where

On the map of Georgia

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Jack McDonough● Natural gas2.85 GW4.5 mi
Morgan Falls● Hydro17 MW13.5 mi
MAS ASB Cogen Plant● Natural gas7 MW8.5 mi
Shepherd Center● Oil6 MW3 mi
Emory Decatur Hospital● Oil4 MW8.1 mi
Bank of America Plaza● Oil3 MW2.1 mi
191 Peachtree Tower● Oil2 MW2.4 mi
Sun Trust Plaza● Oil2 MW2.2 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Jul 10, 2026No significant change to the building since the August 2025 image.24 MW
Aug 21, 2025No significant change to the building since the cluster became operational.24 MW
Feb 20, 2025xAI's GPU cluster in the QTS Atlanta building at 1025 Jefferson Street NW is operational around this time. This date is a tentative estimate: Business Insider reported the buildout in February 2025, so the cluster likely came online around or shortly after then, though the exact date is not disclosed. The cluster comprises 11,000 NVIDIA H100 and about 1,448 A100 GPUs, based on documents submitted to Develop Fulton as reported by Business Insider. xAI occupies part of this multi-tenant building, so its cooling is not attributed to xAI alone.24 MW
Jan 23, 2024X Corp's $700 million investment in AI training hardware for the Atlanta data center is approved by the Development Authority of Fulton County (bond resolution fact sheet).–

How much power does xAI QTS Atlanta use?

About 17 MW as of Jul 10, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 24 MW in its build plans by February 2025. Running all year, 17 MW would use about 0.2 TWh.

Who owns xAI QTS Atlanta?

SpaceXAI; used by SpaceXAI. Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around xAI QTS Atlanta?

In Fulton County, the average customer is without power about 6.2 hours in a typical year in this site's outage record, with 2 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near xAI QTS Atlanta?

8 plants within 15 miles total about 2.90 GW; the largest is Jack McDonough (2.85 GW, natural gas), 4.5 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus

Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.