Data centers · Missouri

Data centers in Missouri

48 operating data center sites, 15 projects planned or under construction and 1 AI campus planned to draw 126 MW.

Operating sites480 whole campuses
AI campuses1105 MW drawn now
In the pipeline155 under construction, 10 planned
Home price13.3¢/kWh+17% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Missouri's AI data centers

CampusOwnerWhereNowPlanned
Google Kansas City EastGoogleJackson County105 MW126 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Nebius Independence Data Center Campus Nebius Jackson Under construction 800 MW –
Amazon Montgomery County Data Center (New Florence) Amazon Montgomery Under construction – –
Google Montgomery County Data Center (New Florence) Google Montgomery Under construction – 2028
Marshfield Area Data Center (Rifle Range Road) – Webster Under construction – –
TierPoint St. Louis Data Center TierPoint St. Louis Under construction – 2025
Beltline Energy Meramec Valley Technology Park BLE Landholdings Franklin Planned 1.3 GW –
CRG Festus Data Center CRG Jefferson Planned 1.0 GW –
White Cloud Acres AI Data Center Scale Microgrids Nodaway Planned 600 MW 2028
Wildwood Ranch / Joplin Data Center Wildwood Ranch LLC Jasper Planned 200 MW –
Metrobloks Liberty Data Center Campus Metrobloks Clay Planned 150 MW 2028
Armory Innovation Data Center Contour / TeraWatt St. Louis Planned 120 MW 2028
Armory Innovation Data Center (Famous-Barr Warehouse) Armory Project team St. Louis Planned 120 MW 2028
Crusoe Warrenton Campus Warrenton DC Owner 1 LLC Warren Planned – 2028
Gateway Digital Campus (Diamond Farms) Provident Data Centers Franklin Planned – –
Project Kestrel Hunt Midwest Jackson Planned – –
Capstone Technology Campus St. Joseph Data Center Capstone Technology Campus Buchanan Cancelled – –
Clayco St Charles Data Center Clayco St. Charles Cancelled – –
Diode Ventures Harper Road Technology Park (Peculiar) Diode Ventures Cass Cancelled – –

Local pushback

Bans and moratoriums

17 recorded as enacted, 0 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Palmyra · Marion City Enacted Sep 3, 2026 Term not documented
Oak Grove · Jackson City Enacted Aug 5, 2026 to Aug 5, 2027
Pacific · Franklin City Enacted Aug 4, 2026 to Aug 4, 2027
Nodaway County · Nodaway County Enacted Jul 21, 2026 to Jan 21, 2027
St. Charles County · St. Charles Local Enacted Jul 13, 2026 to Jan 13, 2027
Neosho · Newton Local Enacted Jul 7, 2026 to Jul 7, 2027
Springfield · Greene Local Enacted Jun 29, 2026 to Nov 17, 2026
Jackson County · Jackson Local Enacted Jun 22, 2026 to Dec 19, 2026
Webster County · Webster County Enacted Jun 16, 2026 to Dec 16, 2026
City of St. Charles · St. Charles Local Enacted May 19, 2026 No end date by design — a permanent ban or standing statute
St. Peters · St. Charles City Enacted May 14, 2026 to May 14, 2027
Camdenton · Camden Local Enacted May 5, 2026 to May 5, 2027
Columbia · Boone Local Enacted May 1, 2026 A stated duration, but the end date isn't recorded here
Ralls County · Ralls County Enacted Jan 1, 2026 to Aug 20, 2027
Marion County · Marion County Rescinded Jan 1, 2026 Term not documented

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Clay County113.8 h
Jackson County88.0 h
St. Louis city625 h
Platte County54.4 h
St. Louis County43.8 h
St. Charles County32.0 h
Boone County10.9 h
Adair County11.9 h
Caldwell County13.0 h
Greene County13.4 h

Every named site

The list

36 of 48 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Meta Data Center Meta Clay Building 14
– Patmos Hosting, Inc. Jackson Building 4.2
Tierpoint St. Louis - Locust Data Center TierPoint St. Louis Civic Returns 3.1
Edged Kansas City Edged Clay Civic Returns 2.8
Black Rock Financial Management – Platte Building 1.8
Iron Mountain KCM-1 Iron Mountain Jackson Civic Returns 1.1
Carfax – Boone Building 0.9
Genome Data Center Washington University in St. Louis St. Louis Building 0.6
TierPoint – St. Louis Building 0.5
Tierpoint St. Louis - Millpark Data Center TierPoint St. Louis Civic Returns 0.5
Netrality Data Centers – St. Louis Building 0.5
– AT&T Adair Building 0.2
CenturyLink – Caldwell Building 0.0
Netrality Data Centers – Jackson Point –
Bluebird Fiber Underground Data Center Bluebird Fiber Greene Operator's own list –
Cogent St Louis Data Center Cogent Communications St. Louis Operator's own list –
Cogent Jefferson City Edge Data Center Cogent Communications Cole Operator's own list –
H5 Data Centers St. Louis, MO H5 Data Centers St. Louis Operator's own list –
LightEdge Kansas City Data Center LightEdge Clay Operator's own list –
Cerner Lee'S Summit Data Center – Jackson EPA record –
Oracle 3200 Data Center Oracle Clay EPA record –
Joe'S Datacenter, Llc (1325 Tracy Avenue) – Jackson EPA record –
Bridge Data Center – St. Louis EPA record –
Centene Data Center – St. Charles EPA record –
Centene Data Center – St. Charles EPA record –

How many data centers are in Missouri?

48 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 18th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Missouri?

5 under construction and 10 planned or announced in the Civic Returns and Server Country databases; the 8 that publish a size add up to about 4.3 GW, besides 1 AI campus tracked by Epoch AI. 3 projects have been cancelled.

Which Missouri county has the most data centers?

Clay County, with 11 operating sites, then Jackson County (8) and St. Louis city (6).

Who operates data centers in Missouri?

Among sites that name an operator: TierPoint (2), Cogent Communications (2), Meta (1), Patmos Hosting, Inc. (1), Edged (1).

What AI data centers are in Missouri?

Google Kansas City East in Kansas City (105 MW now, 126 MW planned), by Epoch AI's estimates.

What do Missouri households pay for electricity?

13.3¢ per kWh on average in 2025 (US: 17.2¢), up 17% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.