107 operating data center sites, 34 projects planned or under construction. Illinois ranks 7th of 51 by mapped sites.

Operating sites1070 whole campuses
AI campuses0None tracked by Epoch AI
In the pipeline3412 under construction, 22 planned
Home price17.7¢/kWh+38% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
ORD Campus CloudHQ Cook Under construction 252 MW 2027
Chicago (Hoffman Estates) Compass Datacenters Cook Under construction 200 MW 2026
Edged Chicago ORD01-2 Edged DuPage Under construction 72 MW 2027
CyrusOne Aurora Campus CyrusOne Kane Under construction 40 MW 2026
Google Cloud - CME Group Aurora Private Cloud Google Cloud Kane Under construction 40 MW 2026
Chicago III Data Center T5 Data Centers Cook Under construction 36 MW 2027
Stark Infrastructure CHI02 Stack Infrastructure Cook Under construction 36 MW 2027
Oppidan: Carol Stream Oppidan DuPage Under construction 10 MW 2026
Compass Datacenters Chicago (Hoffman Estates) campus Compass Datacenters Cook Under construction – –
Meta DeKalb Data Center Meta DeKalb Under construction – –
NTT Global Data Centers Chicago CH3 Data Center NTT Global Data Centers DuPage Under construction – –
Stream Data Center: Chicago III-V Data Center Stream Data Centers Cook Under construction – 2026
Joliet Technology Center Hillwood Will Planned 1.8 GW 2033
Project Cardinal Data Center Pioneer Development Kendall Planned 1.8 GW 2029
Tract - Morris Technology Park Tract Grundy Planned 1.0 GW 2032
Prologis - Yorkville Project Steel Prologis, L.P. Kendall Planned 680 MW 2047
CyrusOne - Yorkville Campus CyrusOne Kendall Planned 654 MW 2028
CyrusOne - Sangamon County Waverly Data Center CyrusOne Morgan Planned 634 MW –
Hut 8 - Logan Prairie Data Center Hut 8 Logan Planned 500 MW –
Prime Data Centers: ORD01-02 Prime Data Centers Cook Planned 54 MW 2025

Local pushback

Bans and moratoriums

14 recorded as enacted, 3 proposed or under review, 2 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Charleston · Coles Local Enacted Oct 6, 2026 to Oct 6, 2027
Lake County · Lake Local Enacted Sep 8, 2026 to May 8, 2027
Mattoon · Coles Local Enacted Sep 1, 2026 Runs until a condition is met, not to a date
Woodford County · Woodford Local Enacted Aug 18, 2026 to Feb 18, 2027
Rockford · Winnebago Local Enacted Aug 3, 2026 to Feb 3, 2027
Illinois (tax incentives) · Sangamon State Enacted Jul 1, 2026 to Jul 1, 2028
Carbondale · Jackson City Enacted Jun 23, 2026 to Jun 23, 2027
Bourbonnais · Kankakee Village Enacted Jun 16, 2026 to Jan 31, 2027
Macon County · Macon County Proposed Jun 4, 2026 Term not documented
Effingham · Effingham City Enacted Jun 2, 2026 to Jun 2, 2027
Bloomington · McLean Local Enacted May 26, 2026 to Nov 26, 2026
Logan County · Logan County Enacted May 19, 2026 to May 19, 2027
Normal · McLean Local Enacted May 19, 2026 to Nov 30, 2026
Champaign County · Champaign Local Enacted Apr 23, 2026 to Apr 23, 2027
Plainfield · Will Village Expired Apr 21, 2026 to Oct 18, 2026

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Cook County582.1 h
DuPage County342.7 h
DeKalb County41.4 h
Lake County21.0 h
Macon County25.7 h
Champaign County13.3 h
Madison County14.5 h
McLean County12.5 h
Sangamon County13.4 h
Ogle County13.2 h

Every named site

The list

103 of 107 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
DeKalb Data Center Meta DeKalb Civic Returns 53
Edged Chicago ORD01-02 Edged DuPage Building 16
– Meta DeKalb Building 13
– Meta DeKalb Building 13
Digital Realty CH1 Digital Realty Cook Building 11
Centersquare Lisle ORD4 Data Center Centersquare DuPage Building 8.2
Digital Realty CH3 Digital Realty Cook Building 7.9
– Meta DeKalb Building 7.3
Iron Mountain CHI-1 Iron Mountain Cook Civic Returns 7.2
Microsoft - Azure Datacenter Microsoft Cook Building 7.0
STACK Chicago CHI01 STACK Infrastructure Cook Building 7.0
Digital Realty CH2 Digital Realty Cook Building 6.9
QTS Chicago QTS Cook Building 6.5
– CyrusOne DuPage Building 6.3
Aligned Data Center – Cook Building 5.9
– CyrusOne DuPage Building 4.9
Stream Chicago II Stream Data Centers Cook Building 4.9
CyrusOne CHI9 CyrusOne DuPage Building 4.9
YLO-01 & 02 Chirisa Technology Parks Lake Civic Returns 4.6
Centersquare Elk Grove Village Data Center Campus ORD2 Centersquare DuPage Building 4.5
Aligned Data Center - Chicago ORD-01 Aligned Cook Building 4.4
Skybox Chicago Skybox DuPage Civic Returns 4.3
Skybox Chicago I Skybox Cook Building 4.0
– CyrusOne DuPage Building 3.9
Equinix Chicago CH3 Equinix Cook Building 3.8

How many data centers are in Illinois?

107 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 7th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Illinois?

12 under construction and 22 planned or announced in the Civic Returns and Server Country databases; the 20 that publish a size add up to about 8.0 GW. 5 projects have been cancelled.

Which Illinois county has the most data centers?

Cook County, with 58 operating sites, then DuPage County (34) and DeKalb County (4).

Who operates data centers in Illinois?

Among sites that name an operator: CyrusOne (8), Digital Realty (7), Microsoft (5), EdgeConneX (5), Meta (4).

What do Illinois households pay for electricity?

17.7¢ per kWh on average in 2025 (US: 17.2¢), up 38% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.