65 operating data center sites, 9 projects planned or under construction. Colorado ranks 14th of 51 by mapped sites.

Operating sites650 whole campuses
AI campuses0None tracked by Epoch AI
In the pipeline94 under construction, 5 planned
Home price15.7¢/kWh+29% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Denver 1 QTS Arapahoe Under construction 177 MW 2026
QTS Aurora-Denver Data Center QTS Realty Trust Arapahoe Under construction 177 MW –
Flexential Parker Data Center Flexential Douglas Under construction 23 MW 2026
CoreSite DE3 Denver Data Center CoreSite (American Tower) Denver Under construction 18 MW 2026
Global AI Windsor Data Center Global AI Weld Planned 1.0 GW 2026
Cielo Hudson Data Center Cielo Digital Infrastructure Weld Planned 750 MW –
Vantage CO21 Aurora Campus Vantage Data Centers Arapahoe Planned 376 MW 2028
Raeden Project Taurus Raeden El Paso Planned 50 MW 2027
CoreSite DE3 CoreSite Denver Planned – –

Local pushback

Bans and moratoriums

13 recorded as enacted, 5 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Grand Junction · Mesa Local Proposed Oct 7, 2026 Runs until a condition is met, not to a date
Mesa County · Mesa Local Enacted Sep 29, 2026 A stated duration, but the end date isn't recorded here
Commerce City · Adams City Proposed Aug 17, 2026 Term not documented
Aurora · Arapahoe Local Rejected Aug 10, 2026 Term not documented
Lochbuie · Weld Local Enacted Jul 21, 2026 to Jul 21, 2031
Monument · El Paso Local Enacted Jul 20, 2026 to Jan 20, 2027
Woodland Park · Teller Local Enacted Jul 16, 2026 to Jan 16, 2028
Broomfield · Broomfield Local Enacted Jul 7, 2026 to Dec 2, 2027
Boulder County · Boulder Local Enacted Jun 2, 2026 to Dec 2, 2026
Denver · Denver Local Enacted May 21, 2026 to May 21, 2027
Phillips County · Phillips County Enacted Feb 27, 2026 to Dec 31, 2026
Larimer County · Larimer Local Enacted Jan 27, 2026 to Feb 25, 2027
Thornton · Adams City Proposed Jan 1, 2026 Term not documented
Longmont · Boulder City Enacted Jan 1, 2026 No end date by design — a permanent ban or standing statute
Jefferson County · Jefferson County Enacted Jan 1, 2026 to Mar 19, 2027

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Arapahoe County172.2 h
El Paso County141.0 h
Douglas County101.2 h
Denver County103.0 h
Adams County62.4 h
Jefferson County55.8 h
Boulder County25.3 h
Broomfield County11.8 h

Every named site

The list

63 of 65 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Walmart Colorado Data Center – El Paso Building 5.0
QTS QTS Arapahoe Building 4.8
Flexential Denver - Englewood Flexential Douglas Building 4.5
JPMorgan Chase JPMorgan Chase Broomfield Building 4.3
Iron Mountain DEN-1 Iron Mountain Denver Civic Returns 4.1
QTS QTS Arapahoe Building 3.8
Centersquare DEN1 Centersquare Douglas Civic Returns 3.2
Colorado Springs Campus - Phase 1 Novva El Paso Civic Returns 2.8
EdgeConnex - DEN02 EdgeConneX Douglas Building 2.6
DataBank - DEN5 DataBank Arapahoe Building 2.5
Google - Thornton Google Adams Building 2.0
CSquare - DEN2 – Douglas Building 1.8
T5@Colorado Springs – El Paso Building 1.7
DataBank - DEN2 DataBank Arapahoe Building 1.4
Time Warner Datacenter – Arapahoe Building 1.4
Xfinity/Comcast Data Center – Arapahoe Building 1.2
Pearl Plaza Office Building – Denver Building 1.1
SAP COS02 SAP El Paso Building 1.1
Flexential - DEN5 Flexential Arapahoe Building 1.0
Time Warner Datacenter – Arapahoe Building 0.8
DataBank - DEN4 DataBank Jefferson Building 0.7
US Signal - CO01 US Signal Douglas Building 0.6
Insurance Exchange Building – Denver Building 0.5
DataBank - DEN1 DataBank Douglas Building 0.3
Verizon Verizon Arapahoe Building 0.2

How many data centers are in Colorado?

65 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 14th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Colorado?

4 under construction and 5 planned or announced in the Civic Returns and Server Country databases; the 8 that publish a size add up to about 2.6 GW.

Which Colorado county has the most data centers?

Arapahoe County, with 17 operating sites, then El Paso County (14) and Douglas County (10).

Who operates data centers in Colorado?

Among sites that name an operator: DataBank (7), Flexential (5), QTS (3), Cogent Communications (3), EdgeConneX (2).

What do Colorado households pay for electricity?

15.7¢ per kWh on average in 2025 (US: 17.2¢), up 29% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.