Data centers · Michigan

Data centers in Michigan

33 operating data center sites, 17 projects planned or under construction and 1 AI campus planned to draw 1.4 GW.

Operating sites330 whole campuses
AI campuses10 MW drawn now
In the pipeline170 under construction, 17 planned
Home price20.0¢/kWh+30% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Michigan's AI data centers

CampusOwnerWhereNowPlanned
OpenAI Stargate MichiganOracleWashtenaw County–1.4 GW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Alterra Marshall Technology Center Alterra Development Calhoun On hold 1.5 GW –
Hyperscale Data Michigan Campus Hyperscale Data, Inc. Cass Planned 340 MW 2029
Metrobloks Southfield Data Center Metrobloks Oakland Planned 100 MW –
US Signal Detroit Metro Expansion US Signal Wayne Planned 3 MW –
Form8tion Augusta Township Data Center Thor Equities Washtenaw Planned – –
Google Van Buren Township Data Center Campus (Project Cannoli) Google Wayne Planned – 2028
Howell Township Hyperscale Data Center Randee LLC Livingston Planned – –
Mason Data Center at 3388 W Columbia Road Unknown developer Ingham Planned – –
Microsoft Dorr Township Data Center Microsoft Allegan Planned – –
Microsoft Gaines Township Site Microsoft Corporation Kent Planned – –
Microsoft Lowell Charter Township Data Center Microsoft Kent Planned – –
Oakland University Campus Computing Facility Oakland University Oakland Planned – –
Project Cherry Blossom Frenchtown Data Center Cloverleaf Infrastructure Monroe Planned – –
Project Flex Data Center Verrus Oakland Planned – –
Project Ironwood Dundee Data Center Cloverleaf Infrastructure Monroe Planned – –
Raeden Gibraltar McLouth Steel Data Center Raeden Wayne Planned – –
Tondu Stronach Township Data Center Concept Tondu Corporation Manistee Planned – –
University of Michigan Textile Road Data Center University of Michigan Washtenaw Planned – –
Rocklocker Kalkaska County Data Center Rocklocker LLC Kalkaska Cancelled 1.0 GW –
Sansone York Township Toyota Land Data Center Sansone Group Washtenaw Cancelled 1.0 GW –

Local pushback

Bans and moratoriums

53 recorded as enacted, 3 proposed or under review, 10 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Brighton Township · Livingston Local Enacted Sep 1, 2026 A stated duration, but the end date isn't recorded here
Garfield Township · Grand Traverse Local Enacted Aug 25, 2026 to Aug 25, 2027
East Lansing · Ingham Local Enacted Aug 11, 2026 to Mar 17, 2027
Rochester Hills · Oakland Local Enacted Aug 1, 2026 to Mar 15, 2027
Haring Township · Wexford Local Enacted Jul 14, 2026 to Jan 14, 2027
Texas Township · Kalamazoo Local Enacted Jun 22, 2026 to Jul 5, 2027
Orion Township · Oakland Local Enacted Jun 17, 2026 to Dec 17, 2026
Lincoln Township · Berrien Local Enacted Jun 11, 2026 to Apr 11, 2027
Allendale Township · Ottawa Local Enacted Jun 8, 2026 to Jun 8, 2027
Flint · Genesee Local Enacted Jun 8, 2026 to Jun 8, 2027
Filer Township · Manistee Local Enacted Jun 2, 2026 to Jun 2, 2027
Niles Charter Township · Berrien Local Enacted Jun 1, 2026 A stated duration, but the end date isn't recorded here
Hart · Oceana Local Enacted May 26, 2026 to Nov 26, 2026
Meridian Township · Ingham Local Enacted May 19, 2026 to Nov 19, 2026
Lowell Township · Kent Local Rejected May 18, 2026 Term not documented

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Kent County87.5 h
Oakland County816 h
Wayne County721 h
Genesee County35.5 h
Eaton County211 h
Cass County113 h
Macomb County19.2 h
Monroe County127 h
Ingham County15.3 h
Grand Traverse County12.8 h

Every named site

The list

28 of 33 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Pyramid Data Center Campus: Phase 2 Switch Kent Civic Returns 7.2
Pyramid Data Center Campus: Phase 1 Switch Kent Civic Returns 5.2
Liquid Web, Inc – Eaton Building 1.7
EdgeConneX Detroit DET01 EdgeConneX Oakland Building 0.9
– Verizon Wayne Building 0.6
– US Signal Wayne Building 0.6
Comcast Comcast Wayne Building 0.0
Chick-fil-A Hiring Center – Macomb Point –
Liberty Center One – Oakland Building –
Bluebird Fiber Grand Rapids Data Center Bluebird Fiber Kent Operator's own list –
Cogent Troy Office & Data Center Cogent Communications Oakland Operator's own list –
Cogent Detroit Data Center Cogent Communications Wayne Operator's own list –
Cogent Grand Rapids Edge Data Center Cogent Communications Kent Operator's own list –
Cogent Lansing Edge Data Center Cogent Communications Ingham Operator's own list –
Cogent Pontiac Edge Data Center Cogent Communications Oakland Operator's own list –
Cogent Flint Edge Data Center Cogent Communications Genesee Operator's own list –
365 Data Centers Detroit, MI 365 Data Centers Oakland Operator's own list –
Lumen Detroit, MI Lumen Wayne Operator's own list –
US Signal MI03 Detroit US Signal Wayne Operator's own list –
US Signal MI05 Detroit US Signal Oakland Operator's own list –
US Signal MI04 Detroit US Signal Oakland Operator's own list –
US Signal MI02 Grand Rapids US Signal Kent Operator's own list –
US Signal MI01 Grand Rapids US Signal Kent Operator's own list –
Corewell Health Bradford Data Center (P0402) – Kent EPA record –
Traverse City Area Public Schools-Sabin Data Center – Grand Traverse EPA record –

How many data centers are in Michigan?

33 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 24th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Michigan?

0 under construction and 17 planned or announced in the Civic Returns and Server Country databases; the 3 that publish a size add up to about 443 MW, besides 1 AI campus tracked by Epoch AI. 6 projects have been cancelled.

Which Michigan county has the most data centers?

Kent County, with 8 operating sites, then Oakland County (8) and Wayne County (7).

Who operates data centers in Michigan?

Among sites that name an operator: US Signal (6), Cogent Communications (6), Switch (3), EdgeConneX (1), Verizon (1).

What AI data centers are in Michigan?

OpenAI Stargate Michigan in Benton (not yet drawing power, 1.4 GW planned), by Epoch AI's estimates.

What do Michigan households pay for electricity?

20.0¢ per kWh on average in 2025 (US: 17.2¢), up 30% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.