435 operating data center sites, 147 projects planned or under construction and 7 AI campuses planned to draw 2.0 GW. Virginia ranks 1st of 51 by mapped sites.

Operating sites43521 whole campuses
AI campuses71.0 GW drawn now
In the pipeline14726 under construction, 121 planned
Home price15.3¢/kWh+30% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Virginia's AI data centers

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
CleanArc VA1 Campus CleanArc Data Centers Caroline Under construction 900 MW 2027
CleanArc VA1 Campus CleanArc Data Centers Caroline Under construction 900 MW 2027
PowerHouse 95 - Phase 2 PowerHouse Spotsylvania Under construction 500 MW 2027
AWS Spotsylvania County Campus Amazon Web Services Spotsylvania Under construction 450 MW 2029
Cosner Tech Campus Amazon Spotsylvania Under construction 450 MW 2029
Lake Anna Tech Campus Amazon Louisa Under construction 420 MW 2026
Richmond Campus (Menlo Digital) Menlo Digital Petersburg Under construction 300 MW 2026
EdgeCore AS01 and AS02 EdgeCore Loudoun Under construction 114 MW 2026
Ashburn Data Center Campus VA2 Vantage Data Centers Loudoun Under construction 96 MW –
Sabey Ashburn Building A Sabey Data Centers Loudoun Under construction 54 MW 2026
Herndon Data Center (Menlo Digital) Menlo Digital Fairfax Under construction 48 MW –
EdgeCore Dulles EdgeCore Loudoun Under construction 42 MW 2027
MECP 1 ASHBURN 2 LLC EdgeCore Loudoun Under construction 42 MW 2027
QTS Ashburn 1 DC2 QTS Loudoun Under construction 28 MW 2026
22165 BEAUMEADE CIR Equinix Loudoun Under construction 10 MW –
Corscale Gainesville Crossing Corscale Prince William Under construction – –
Google Chesterfield County, Virginia Google Chesterfield Under construction – –
Greenfield Google Botetourt Under construction – 2028
Hunter's Ridge Hunters Ridge LLC Spotsylvania Under construction – –
NTT Global Data Centers VA11 Data Center NTT Global Data Centers Prince William Under construction – –

Local pushback

Bans and moratoriums

11 recorded as enacted, 2 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Virginia Beach · Virginia Beach Local Enacted Aug 18, 2026 to Aug 18, 2027
Virginia (statewide pause request) · Richmond State Rejected Aug 11, 2026 Term not documented
Spotsylvania County · Spotsylvania Local Enacted Aug 11, 2026 No end date by design — a permanent ban or standing statute
Loudoun County · Loudoun Local Proposed Jul 22, 2026 Term not documented
Front Royal · Warren Local Enacted Jul 6, 2026 A stated duration, but the end date isn't recorded here
Chesapeake · Chesapeake Local Enacted Jul 1, 2026 A stated duration, but the end date isn't recorded here
Virginia (data center power tax) · Buckingham State Enacted Jun 30, 2026 No end date by design — a permanent ban or standing statute
Suffolk · Suffolk Local Proposed Jun 17, 2026 Term not documented
Virginia (2026 General Assembly package) · Richmond State Enacted Mar 1, 2026 No end date by design — a permanent ban or standing statute
Virginia (Dominion GS-5 large-load rate class) · Richmond State Enacted Nov 25, 2025 No end date by design — a permanent ban or standing statute
Stafford County · Stafford Local Enacted Oct 21, 2025 No end date by design — a permanent ban or standing statute
Culpeper County · Culpeper Local Enacted Sep 2, 2025 No end date by design — a permanent ban or standing statute
Fluvanna County · Fluvanna Local Enacted Sep 1, 2025 to Dec 31, 2026
Fairfax County · Fairfax Local Enacted Sep 10, 2024 No end date by design — a permanent ban or standing statute

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Loudoun County2092.6 h
Prince William County691.8 h
Fairfax County523.5 h
Henrico County3010 h
Mecklenburg County3012 h
Manassas city12–
Culpeper County58.7 h
Chesterfield County47.4 h
Fauquier County314 h
Harrisonburg city2–

Every named site

The list

403 of 435 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
True North Data Centers True North Data Solutions Loudoun Campus, 5 buildings 105
Digital Loudoun Plaza Digital Realty Loudoun Campus, 8 buildings 65
Google Data Center Google Loudoun Campus, 2 buildings 49
Arcola Tech Park Microsoft Loudoun Campus, 3 buildings 40
Amazon IAD-120 Amazon Web Services Loudoun Campus, 3 buildings 35
Microsoft Microsoft Loudoun Campus, 4 buildings 34
Equinix CU2 Equinix Culpeper Campus 30
Stonewall Creek Business Park Google Loudoun Campus, 2 buildings 29
Amazon IAD-64 Amazon Web Services Prince William Campus, 4 buildings 29
QTS Ashburn Lockridge QTS Loudoun Campus, 2 buildings 28
Amazon Web Services Datacenter Complex Amazon Web Services Loudoun Campus, 3 buildings 25
Amazon Web Services Amazon Web Services Loudoun Campus, 3 buildings 23
Amazon IAD-14 Amazon Web Services Prince William Campus, 3 buildings 23
Valo Park TAMARES 7950 OWNER LLC Fairfax Civic Returns 19
Amazon IAD-58 Amazon Web Services Loudoun Campus, 2 buildings 16
Digital Loudoun Plaza Digital Realty Loudoun Campus, 2 buildings 16
Meta Henrico Data Center Meta Henrico Building 14
Meta Henrico Data Center Meta Henrico Building 13
Digital Realty IAD39 Digital Realty Loudoun Building 13
CyrusOne NVA5 CyrusOne Loudoun Building 12
DBT Data - Harrisonburg Center – Harrisonburg Campus 12
CloudHQ LC1 CloudHQ Loudoun Building 11
CloudHQ LC4 CloudHQ Loudoun Building 11
NTT VA10 NTT Prince William Building 11
Digital Realty ACC7 Digital Realty Loudoun Building 9.4

How many data centers are in Virginia?

435 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the most of any state. 21 are mapped as whole campuses. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Virginia?

26 under construction and 121 planned or announced in the Civic Returns and Server Country databases; the 45 that publish a size add up to about 24.6 GW, besides 7 AI campuses tracked by Epoch AI. 8 projects have been cancelled.

Which Virginia county has the most data centers?

Loudoun County, with 209 operating sites, then Prince William County (69) and Fairfax County (52).

Who operates data centers in Virginia?

Among sites that name an operator: Amazon Web Services (128), Digital Realty (27), Equinix (22), QTS (22), CloudHQ (13).

What AI data centers are in Virginia?

QTS Richmond 1 in Sandston (238 MW now, 333 MW planned); Google Bristow in Bristow (238 MW now, 286 MW planned); QTS Richmond 2 in Sandston (180 MW now, 252 MW planned); QTS Richmond 3 in Sandston (144 MW now, 336 MW planned); STACK Infrastructure NVA02 in Manassas (85 MW now, 487 MW planned); CoreWeave Chester VA in Chester (82 MW now, 197 MW planned); Google Arcola in Arcola (77 MW now, 93 MW planned), by Epoch AI's estimates.

What do Virginia households pay for electricity?

15.3¢ per kWh on average in 2025 (US: 17.2¢), up 30% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.