AI data center · Arcola, Virginia

Google Arcola

Google's AI campus in Loudoun County. It draws about 77 MW today and is planned to reach 93 MW by June 2026.

Power now77 MWAs of Jun 16, 2026
Planned peak93 MWJune 2026
Compute108kH100-equivalent chips now
Capital cost$2.9BSo far, 2025 dollars

Latest look · Jun 16, 2026

What the satellite shows

Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.

Build-out

Power, month by month

0 MW20 MW40 MW60 MW80 MW100 MW120 MW20252026
Power drawn by Google Arcola, from Epoch AI's dated observations.
0 MW20 MW40 MW60 MW80 MW100 MW120 MW20252026
Power drawn by Google Arcola, from Epoch AI's dated observations.

Who

Owners, users and builders

Owner
Google
Chips
TPU v6e, TPU v7
Address
42575 Arcola Blvd, Sterling, VA 20166
County
Loudoun County (approximate)

Where

On the map of Virginia

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed at the centre of Arcola, as no address could be matched, so the dot and the county are approximate.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Potomac Energy Center, LLC● Natural gas812 MW7.9 mi
Dominion/Lo Mar● Oil19 MW14 mi
VMEA 1 Credit Gen● Oil13 MW14.1 mi
VMEA Peaking Gen● Oil6 MW14.1 mi
Godwin Drive Plant● Oil6 MW14.1 mi
Church Street Plant● Oil4 MW13.8 mi
VA- US Foods- Manassas● Solar2 MW11 mi
Water Treatment Plant Generators● Oil2 MW13.5 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Jun 16, 2026Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.93 MW
Apr 9, 2026Building 1 appears almost complete, with minimal construction activity.–
Sep 8, 2025Building 1 roof complete, cooling towers in progress.–
Oct 1, 2024Building 1 foundation started–

How much power does Google Arcola use?

About 77 MW as of Jun 16, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 93 MW in its build plans by June 2026. Running all year, 77 MW would use about 0.7 TWh.

Who owns Google Arcola?

Google. Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Google Arcola?

In Loudoun County, the average customer is without power about 2.6 hours in a typical year in this site's outage record, with 2 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Google Arcola?

8 plants within 15 miles total about 866 MW; the largest is Potomac Energy Center, LLC (812 MW, natural gas), 7.9 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus

Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.