AI data center · Holly Ridge, Louisiana
Meta Hyperion
Meta's AI campus in Richland Parish. It is not drawing power yet and is planned to reach 2.20 GW by January 2028.
Latest look · Apr 19, 2026
What the satellite shows
Building 1 and 2 roof is finished and cooling is at an advanced stage of installation. Building 3 and 6 roof and cooling in progress.
Build-out
Power, month by month
Who
Owners, users and builders
- Owner
- Meta
- Used by
- Meta
- Project
- Hyperion
- Built by
- Mortenson
- Energy companies
- Entergy
- Chips
- Rubin
- Address
- Holly Ridge, LA 71269
- County
- Richland Parish
Where
On the map of Louisiana
Placed by its street address.
Nearby
Power plants within 15 miles
| Plant | Source | Capacity | Distance |
|---|---|---|---|
| Oak Ridge Solar | ● Solar | 200 MW | 12 mi |
Timeline
Every observation
| Date | What Epoch AI saw | Power |
|---|---|---|
| Apr 19, 2026 | Building 1 and 2 roof is finished and cooling is at an advanced stage of installation. Building 3 and 6 roof and cooling in progress. | – |
| Oct 19, 2025 | Foundations are underway for the main buildings, and the overall layout aligns with the architectural renderings published in 2025. | – |
| Dec 20, 2024 | Land clearing begins. | – |
Plus 2 projected steps to January 2028, from Epoch AI's reading of the build plans.
How much power does Meta Hyperion use?
It is not drawing power yet in Epoch AI's timeline; it is planned to reach about 2.20 GW by January 2028.
Who owns Meta Hyperion?
Meta; used by Meta. Labels in brackets are Epoch AI's confidence where it is not "confident".
How reliable is the power around Meta Hyperion?
In Richland Parish, the average customer is without power about 12 hours in a typical year in this site's outage record, with 41 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.
What power plants are near Meta Hyperion?
One plant is within 15 miles: Oak Ridge Solar (200 MW, solar), 12 miles away. Nearness does not mean it supplies the campus.
Epoch AI's sources for this campus
- Data center profile by Meta
- Entergy's application for generation and transmission resources
- MISO update with 1.8 GW substation plan
- S&P Global ratings research with 2.064 GW campus details
Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.