AI data center · Holly Ridge, Louisiana

Meta Hyperion

Meta's AI campus in Richland Parish. It is not drawing power yet and is planned to reach 2.20 GW by January 2028.

Power now–As of Apr 19, 2026
Planned peak2.20 GWJanuary 2028
Compute–H100-equivalent chips now
Capital cost–So far, 2025 dollars

Latest look · Apr 19, 2026

What the satellite shows

Building 1 and 2 roof is finished and cooling is at an advanced stage of installation. Building 3 and 6 roof and cooling in progress.

Build-out

Power, month by month

0 MW500 MW1 GW1.5 GW2 GW2.5 GW2025202620272028Today
Power drawn by Meta Hyperion, from Epoch AI's dated observations and (hatched) its projections.
0 MW500 MW1 GW1.5 GW2 GW2.5 GW2025202620272028Today
Power drawn by Meta Hyperion, from Epoch AI's dated observations and (hatched) its projections.

Who

Owners, users and builders

Owner
Meta
Used by
Meta
Project
Hyperion
Built by
Mortenson
Energy companies
Entergy
Chips
Rubin
Address
Holly Ridge, LA 71269
County
Richland Parish

Where

On the map of Louisiana

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Oak Ridge Solar● Solar200 MW12 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Apr 19, 2026Building 1 and 2 roof is finished and cooling is at an advanced stage of installation. Building 3 and 6 roof and cooling in progress.–
Oct 19, 2025Foundations are underway for the main buildings, and the overall layout aligns with the architectural renderings published in 2025.–
Dec 20, 2024Land clearing begins.–

Plus 2 projected steps to January 2028, from Epoch AI's reading of the build plans.

How much power does Meta Hyperion use?

It is not drawing power yet in Epoch AI's timeline; it is planned to reach about 2.20 GW by January 2028.

Who owns Meta Hyperion?

Meta; used by Meta. Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Meta Hyperion?

In Richland Parish, the average customer is without power about 12 hours in a typical year in this site's outage record, with 41 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Meta Hyperion?

One plant is within 15 miles: Oak Ridge Solar (200 MW, solar), 12 miles away. Nearness does not mean it supplies the campus.