AI data center · Council Bluffs, Iowa
Google Council Bluffs (East)
Google's AI campus in Pottawattamie County. It draws about 237 MW today and is planned to reach 284 MW by July 2026.
Latest look · Jul 7, 2026
What the satellite shows
Building 3 is operational. 7 cooling towers were finally installed despite being more spread out compared to the first two buildings. Cooling towers models vary slightly between buildings. Ground clearing to the southwest seems to be setting up for two more buildings.
Build-out
Power, month by month
Who
Owners, users and builders
- Owner
- Used by
- Google DeepMind (speculative)
- Chips
- TPU v5e, TPU v6e, TPU v5p, TPU v7
- Address
- 10410 Bunge Ave, Council Bluffs, IA 51503
- County
- Pottawattamie County
Where
On the map of Iowa
Placed by its street address.
Nearby
Power plants within 15 miles
| Plant | Source | Capacity | Distance |
|---|---|---|---|
| Walter Scott Jr Energy Center | ● Coal | 1.65 GW | 2.6 mi |
| North Omaha | ● Coal | 645 MW | 13.7 mi |
| Sarpy County | ● Natural gas | 338 MW | 9.2 mi |
| Jones Street | ● Oil | 130 MW | 8.9 mi |
| Missouri River Wastewater Treatment | ● Biomass | 3 MW | 7.5 mi |
Timeline
Every observation
| Date | What Epoch AI saw | Power |
|---|---|---|
| Jul 7, 2026 | Building 3 is operational. 7 cooling towers were finally installed despite being more spread out compared to the first two buildings. Cooling towers models vary slightly between buildings. Ground clearing to the southwest seems to be setting up for two more buildings. | 284 MW |
| Jan 11, 2026 | Building 3 has all 34 backup generators installed and 4 cooling towers installed, with 3 more cooling towers under construction. There are gaps between cooling towers suggesting that more could be added. Buildings 1 and 2 are running close to full capacity, given that water vapor is coming out of 5 of 7 cooling towers for each building. The land cleared in the southwest appears to be shaped for two more similar buildings, with notches for substations. | 190 MW |
| Jul 19, 2025 | Land clearing begins in the southwest, suggesting more buildings are planned. | 190 MW |
| Jun 15, 2025 | Building 2 is operational. Assuming it takes 3 months after generators and cooling towers are finished, similar to Building 1. | 190 MW |
| Nov 19, 2024 | Building 1 is operational. Google Earth shows Building 1 had all backup generators and cooling towers installed by the end of August, but construction work was ongoing and there were almost no cars parked. By February 2025, Google Earth shows no construction work and many cars. So our best guess is in the middle, in November 2024. Building 3 roof is complete. | 95 MW |
| Sep 6, 2022 | Land clearing begins for east buildings | – |
How much power does Google Council Bluffs (East) use?
About 237 MW as of Jul 7, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 284 MW in its build plans by July 2026. Running all year, 237 MW would use about 2.1 TWh.
Who owns Google Council Bluffs (East)?
Google; used by Google DeepMind (speculative). Labels in brackets are Epoch AI's confidence where it is not "confident".
How reliable is the power around Google Council Bluffs (East)?
In Pottawattamie County, the average customer is without power about 3.0 hours in a typical year in this site's outage record, with 9 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.
What power plants are near Google Council Bluffs (East)?
5 plants within 15 miles total about 2.76 GW; the largest is Walter Scott Jr Energy Center (1.65 GW, coal), 2.6 miles away. Nearness does not mean it supplies the campus.
Epoch AI's sources for this campus
- Construction permit application form with site address
- Construction permit application form with backup generator data
Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.