AI data center · Council Bluffs, Iowa

Google Council Bluffs (East)

Google's AI campus in Pottawattamie County. It draws about 237 MW today and is planned to reach 284 MW by July 2026.

Power now237 MWAs of Jul 7, 2026
Planned peak284 MWJuly 2026
Compute256kH100-equivalent chips now
Capital cost$9.0BSo far, 2025 dollars

Latest look · Jul 7, 2026

What the satellite shows

Building 3 is operational. 7 cooling towers were finally installed despite being more spread out compared to the first two buildings. Cooling towers models vary slightly between buildings. Ground clearing to the southwest seems to be setting up for two more buildings.

Build-out

Power, month by month

0 MW100 MW200 MW300 MW400 MW2023202420252026
Power drawn by Google Council Bluffs (East), from Epoch AI's dated observations.
0 MW100 MW200 MW300 MW400 MW2023202420252026
Power drawn by Google Council Bluffs (East), from Epoch AI's dated observations.

Who

Owners, users and builders

Owner
Google
Used by
Google DeepMind (speculative)
Chips
TPU v5e, TPU v6e, TPU v5p, TPU v7
Address
10410 Bunge Ave, Council Bluffs, IA 51503
County
Pottawattamie County

Where

On the map of Iowa

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Walter Scott Jr Energy Center● Coal1.65 GW2.6 mi
North Omaha● Coal645 MW13.7 mi
Sarpy County● Natural gas338 MW9.2 mi
Jones Street● Oil130 MW8.9 mi
Missouri River Wastewater Treatment● Biomass3 MW7.5 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Jul 7, 2026Building 3 is operational. 7 cooling towers were finally installed despite being more spread out compared to the first two buildings. Cooling towers models vary slightly between buildings. Ground clearing to the southwest seems to be setting up for two more buildings.284 MW
Jan 11, 2026Building 3 has all 34 backup generators installed and 4 cooling towers installed, with 3 more cooling towers under construction. There are gaps between cooling towers suggesting that more could be added. Buildings 1 and 2 are running close to full capacity, given that water vapor is coming out of 5 of 7 cooling towers for each building. The land cleared in the southwest appears to be shaped for two more similar buildings, with notches for substations.190 MW
Jul 19, 2025Land clearing begins in the southwest, suggesting more buildings are planned.190 MW
Jun 15, 2025Building 2 is operational. Assuming it takes 3 months after generators and cooling towers are finished, similar to Building 1.190 MW
Nov 19, 2024Building 1 is operational. Google Earth shows Building 1 had all backup generators and cooling towers installed by the end of August, but construction work was ongoing and there were almost no cars parked. By February 2025, Google Earth shows no construction work and many cars. So our best guess is in the middle, in November 2024. Building 3 roof is complete.95 MW
Sep 6, 2022Land clearing begins for east buildings–

How much power does Google Council Bluffs (East) use?

About 237 MW as of Jul 7, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 284 MW in its build plans by July 2026. Running all year, 237 MW would use about 2.1 TWh.

Who owns Google Council Bluffs (East)?

Google; used by Google DeepMind (speculative). Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Google Council Bluffs (East)?

In Pottawattamie County, the average customer is without power about 3.0 hours in a typical year in this site's outage record, with 9 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Google Council Bluffs (East)?

5 plants within 15 miles total about 2.76 GW; the largest is Walter Scott Jr Energy Center (1.65 GW, coal), 2.6 miles away. Nearness does not mean it supplies the campus.