AI data center · Cumming, Iowa
Microsoft Project Osmium
Microsoft's AI campus in Warren County. It draws about 190 MW today and is planned to reach 228 MW by March 2025.
Latest look · Jun 16, 2026
What the satellite shows
No notable changes since October.
Build-out
Power, month by month
Who
Owners, users and builders
- Owner
- Microsoft
- Used by
- OpenAI (speculative)
- Chips
- A100, H100, B200
- Address
- 5855 SW Kerry St, Cumming, IA 50061
- County
- Warren County (approximate)
Where
On the map of Iowa
Placed at the centre of Cumming, as no address could be matched, so the dot and the county are approximate.
Nearby
Power plants within 15 miles
| Plant | Source | Capacity | Distance |
|---|---|---|---|
| Greater Des Moines | ● Natural gas | 576 MW | 13.1 mi |
| Pleasant Hill | ● Natural gas | 180 MW | 13.3 mi |
| Sycamore (IA) | ● Natural gas | 158 MW | 13.7 mi |
| River Hills | ● Natural gas | 128 MW | 10.4 mi |
| Indianola | ● Oil | 41 MW | 13.4 mi |
| Archer Daniels Midland Des Moines | ● Natural gas | 8 MW | 13.3 mi |
| Indianola Solar | ● Solar | 3 MW | 13.8 mi |
| Des Moines Wastewater Reclamation Fac | ● Biomass | 3 MW | 12.2 mi |
Timeline
Every observation
| Date | What Epoch AI saw | Power |
|---|---|---|
| Jun 16, 2026 | No notable changes since October. | 228 MW |
| Oct 8, 2025 | Site already complete. | 228 MW |
| Mar 1, 2025 | Building 3-4 operational, no visible construction. | 228 MW |
| Jun 30, 2023 | Building 2 is operational. Estimated based on Microsoft H100 count 2023 | 114 MW |
| Jan 1, 2021 | Building 1 and 1st building on the site are operational. Foundation work begins on Building 2 | 57 MW |
| Dec 18, 2018 | Land clearing begins on the north part of the site | – |
How much power does Microsoft Project Osmium use?
About 190 MW as of Jun 16, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 228 MW in its build plans by March 2025. Running all year, 190 MW would use about 1.7 TWh.
Who owns Microsoft Project Osmium?
Microsoft; used by OpenAI (speculative). Labels in brackets are Epoch AI's confidence where it is not "confident".
How reliable is the power around Microsoft Project Osmium?
In Warren County, the average customer is without power about 2.5 hours in a typical year in this site's outage record, with 9 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.
What power plants are near Microsoft Project Osmium?
8 plants within 15 miles total about 1.10 GW; the largest is Greater Des Moines (576 MW, natural gas), 13.1 miles away. Nearness does not mean it supplies the campus.
Epoch AI's sources for this campus
- SemiAnalysis article with IT power estimations and detailing usage by OpenAI for training GPT 3.5
- DCD Article on site expansion
- MISO Announcement reporting power for newest buildings, likely an overestimate
- Microsoft article on data centers in Iowa used by OpenAI
Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.