AI data center · Cheyenne, Wyoming

Meta Cheyenne

Meta's AI campus in Laramie County. It draws about 152 MW today and is planned to reach 249 MW by February 2027.

Power now152 MWAs of Jul 25, 2026
Planned peak249 MWFebruary 2027
Compute173kH100-equivalent chips now
Capital cost$5.8BSo far, 2025 dollars

Latest look · Jul 25, 2026

What the satellite shows

Both buildings estimated to be operational.

Build-out

Power, month by month

0 MW100 MW200 MW300 MW202520262027Today
Power drawn by Meta Cheyenne, from Epoch AI's dated observations and (hatched) its projections.
0 MW100 MW200 MW300 MW202520262027Today
Power drawn by Meta Cheyenne, from Epoch AI's dated observations and (hatched) its projections.

Who

Owners, users and builders

Owner
Meta
Used by
Meta
Chips
B300
Water use
0.00 million gallons a day (Epoch AI estimate)
Address
Cheyenne, WY 82007, USA
County
Laramie County

Where

On the map of Wyoming

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
South Cheyenne Solar● Solar150 MW8.1 mi
Cheyenne Prairie Generating Station● Natural gas140 MW5.3 mi
Roundhouse Renewable Energy II● Wind106 MW10.9 mi
Corriedale Wind Energy● Wind53 MW8.7 mi
Silver Sage Windpower● Wind42 MW10.6 mi
Happy Jack Windpower Project● Wind29 MW9.2 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Jul 25, 2026Both buildings estimated to be operational.182 MW
Mar 22, 2026Building 1 shell and cooling looks complete, Building 2 roof almost complete.–
Jan 30, 2025Structure for Building 1 and 2 under construction.–
May 1, 2024Land clearing begins.–

Plus 1 projected step to February 2027, from Epoch AI's reading of the build plans.

How much power does Meta Cheyenne use?

About 152 MW as of Jul 25, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 249 MW in its build plans by February 2027. Running all year, 152 MW would use about 1.3 TWh.

Who owns Meta Cheyenne?

Meta; used by Meta. Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Meta Cheyenne?

In Laramie County, the average customer is without power about 1.0 hours in a typical year in this site's outage record, with 2 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Meta Cheyenne?

6 plants within 15 miles total about 520 MW; the largest is South Cheyenne Solar (150 MW, solar), 8.1 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus

Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.